X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555151307030

Well Details

Well ID: 0555151307030
Loading map...
Location: 03/07-13-055-15W5/0
Location Alias: 03/07-13-55-15 W5M
Location Alias 2: 03/07-13-055-15 W5/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 15
Section: 13
County/Municipality: Yellowhead County
Well Name: DAYLIGHT MCLEOD 7-13-55-15
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0198380
License Date: 1997-02-21
License Status: Suspension
Spud Date: 1997-03-14
Final Drill Date: 1997-04-01
Well Total Depth: 2800.00 m
Surface Hole Latitude: 53.749908
Surface Hole Longitude: -116.091101

For data sources see[1][2]

Well History

Date Event
1997-02-21 Obtained License
1997-03-17 Surface Casing Operation Performed
1997-04-01 Finished Drilling
1997-04-01 Well Mode changed to Drilled and Cased
1997-04-04 Well Log Performed
1997-04-05 Well Log Performed
1997-04-07 Production Casing Operation Performed
1997-04-08 Rig Released
1997-04-12 Well Log Performed
1997-04-13 Well Log Performed
1997-04-14 Perforation Treatment Performed - Jet Perforation
1997-04-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-16 Well Log Performed
1997-04-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-04-17 Perforation Treatment Performed - Jet Perforation
1997-04-17 Plug Back Performed
1997-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-20 Well Log Performed
1997-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-04-22 Perforation Treatment Performed - Jet Perforation
1997-04-22 Plug Back Performed
1997-04-22 Well Log Performed
1997-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-24 Perforation Treatment Performed - Fractured
1997-06-24 Well Began Production
1997-06-24 Well Fluid changed to Crude Oil
1997-06-24 Well Mode changed to Pumping
2000-08-20 Well Log Performed
2011-10-01 Well Fluid changed to Crude Oil
2011-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-04-14 Perforation 2738.00 2740.00 13
1997-04-22 Acid Treatment 2391.50 2396.00 0
1997-04-23 Acid Treatment 2391.50 2396.00 0
1997-04-24 Fracture 2391.50 2396.00 0
1997-04-15 Acid Treatment 2738.00 2740.00 0
1997-04-17 Packing Device Capped w/Cement 2725.00 2733.00 0
1997-04-17 Perforation 2532.50 2534.00 18
1997-04-17 Perforation 2549.00 2551.00 18
1997-04-17 Perforation 2581.00 2585.00 13
1997-04-18 Acid Treatment 2532.50 2585.00 0
1997-04-22 Packing Device Capped w/Cement 2315.00 2523.00 0
1997-04-22 Perforation 2391.50 2396.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 4239 0.0 0.0 0.0
1998 7332 0.0 0.0 0.0
1999 2602 0.0 0.0 0.0
2000 6834 0.0 0.0 0.0
2001 5719 0.0 0.0 0.0
2002 5706 0.0 0.0 0.0
2003 7974 0.0 0.0 0.0
2004 8462 0.0 0.0 0.0
2005 8737 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 1176 0.0 0.0 0.0

For data sources see[5]

References