X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555220601004

Well Details

Well ID: 0555220601004
Loading map...
Location: 00/01-06-055-22W5/4
Location Alias: 00/01-06-55-22 W5M
Location Alias 2: 00/01-06-055-22 W5/04
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 22
Section: 06
County/Municipality: Yellowhead County
Well Name: PETRUS SUNDANCE 8-6-55-22
Operator Name: Petrus Resources Corp.
License Number: 0109782
License Date: 1984-10-10
License Status: Abandoned
Spud Date: 1984-11-06
Final Drill Date: 1997-09-12
Well Total Depth: 4350.00 m
Surface Hole Latitude: 53.719605
Surface Hole Longitude: -117.252124

For data sources see[1][2]

Well History

Date Event
1984-10-10 Obtained License
1984-12-23 Direction Drilling Operation Performed - Deviate
1997-08-19 Well Log Performed
1997-08-20 Direction Drilling Operation Performed - Horizontal
1997-09-10 Direction Drilling Operation Performed - Horizontal
1997-09-12 Finished Drilling
1997-09-12 Well Mode changed to Drilled and Cased
1997-09-13 Liner Casing Operation Performed
1997-09-19 Well Log Performed
1997-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-27 Perforation Treatment Performed - Open-Hole Completion
1997-10-09 Rig Released
1998-02-14 Perforation Treatment Performed - Cement Squeeze
1998-02-14 Plug Back Performed
1998-02-15 Perforation Treatment Performed - Jet Perforation
1998-02-15 Well Log Performed
1998-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-29 Perforation Treatment Performed - Cement Squeeze
1998-07-29 Plug Back Performed
1998-08-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-08-11 Well Log Performed
1998-08-12 Well Log Performed
1998-08-14 Perforation Treatment Performed - Jet Perforation
1998-08-22 Well Began Production
1998-08-22 Well Fluid changed to Gas
1998-08-22 Well Mode changed to Flowing
1999-04-22 Perforation Treatment Performed - Jet Perforation
1999-04-22 Well Fluid changed to Gas
1999-04-22 Well Log Performed
1999-04-22 Well Mode changed to Flowing
1999-08-26 Perforation Treatment Performed - Jet Perforation
2002-04-01 Perforation Treatment Performed - Cement Squeeze
2002-04-01 Plug Back Performed
2002-04-01 Well Fluid changed to Gas
2002-04-01 Well Mode changed to Abandoned Zone
2002-04-02 Perforation Treatment Performed - Cement Squeeze
2002-04-02 Plug Back Performed
2002-04-20 Perforation Treatment Performed - Jet Perforation
2002-04-21 Perforation Treatment Performed - Remedial Casing
2002-04-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-04-22 Perforation Treatment Performed - Cement Squeeze
2002-04-22 Perforation Treatment Performed - Jet Perforation
2002-04-22 Plug Back Performed
2002-04-27 Perforation Treatment Performed - Jet Perforation
2002-05-14 Perforation Treatment Performed - Fractured
2010-09-08 Perforation Treatment Performed - Cement Plug
2010-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-10 Plug Back Performed
2010-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-14 Perforation Treatment Performed - Jet Perforation
2010-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-15 Perforation Treatment Performed - Jet Perforation
2010-09-16 Perforation Treatment Performed - Remedial Casing
2010-09-17 Perforation Treatment Performed - Jet Perforation
2010-09-17 Well Log Performed
2010-09-18 Perforation Treatment Performed - Remedial Casing
2010-09-19 Perforation Treatment Performed - Jet Perforation
2010-09-20 Perforation Treatment Performed - Remedial Casing
2010-10-18 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-12-23 2828.00 Deviate (5 - 79 degrees)
1997-08-20 3906.50 Horizontal
1997-09-10 4139.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-09-27 Open Hole/Barefoot Completion 4111.00 4350.00 0
1999-04-22 Perforation 3343.00 3352.00 14
1999-08-26 Perforation 3331.80 3337.30 20
2002-04-01 Cement Squeeze 3250.00 3253.00 0
2002-04-02 Cement Squeeze 3331.80 3352.00 0
2002-04-20 Perforation 3963.00 3964.00 72
2002-04-21 Remedial Casing Cementing 3963.00 3964.00 0
2002-04-22 Perforation 3901.00 3902.00 36
2002-04-22 Packing Device Capped w/Cement 3952.00 3960.00 0
2002-04-22 Perforation 3894.00 3895.00 36
2002-04-22 Cement Squeeze 3894.00 3902.00 0
1997-09-27 Acid Treatment 4111.00 4350.00 0
2002-04-27 Perforation 3895.00 3899.00 20
2002-04-27 Perforation 3890.00 3893.50 20
2002-05-14 Fracture 3890.00 3899.00 0
2010-09-08 Cement Plug 3705.00 3877.50 0
2010-09-10 Packing Device Capped w/Cement 3674.50 3682.50 0
2010-09-11 Packing Device Capped w/Cement 3313.00 3321.00 0
2010-09-11 Packing Device Capped w/Cement 3231.80 3240.00 0
2010-09-13 Packing Device Capped w/Cement 2631.80 2640.00 0
2010-09-14 Perforation 2186.00 2187.00 17
2010-09-14 Packing Device Capped w/Cement 2171.80 2180.00 0
1998-02-14 Cement Squeeze 4111.00 4350.00 0
2010-09-15 Perforation 1900.00 1901.00 17
2010-09-15 Packing Device Capped w/Cement 1881.80 1890.00 0
2010-09-15 Perforation 1637.00 1638.00 17
2010-09-16 Remedial Casing Cementing 1637.00 1638.00 0
2010-09-17 Perforation 745.00 746.00 17
2010-09-18 Remedial Casing Cementing 745.00 746.00 0
2010-09-19 Perforation 599.00 600.00 17
2010-09-20 Remedial Casing Cementing 599.00 600.00 0
1998-02-15 Perforation 4030.00 4039.30 13
1998-02-15 Perforation 4037.10 4045.10 13
1998-02-16 Acid Treatment 4030.00 4045.10 0
1998-07-29 Cement Squeeze 4030.00 4045.10 0
1998-08-11 Packing Device Capped w/Cement 3702.20 3710.20 0
1998-08-14 Perforation 3250.00 3253.00 16

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 2704 0.0 0.0 0.0
1999 1782 0.0 0.0 0.0
2000 709 0.0 0.0 0.0

For data sources see[6]

References