X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564042502002

Well Details

Well ID: 0564042502002
Loading map...
Location: 00/02-25-056-04W4/2
Location Alias: 00/02-25-56-04 W4M
Location Alias 2: 00/02-25-056-04 W4/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 04
Section: 25
County/Municipality: County of St. Paul No. 19
Well Name: WLEC LIND 2-25-56-4
Operator Name: West Lake Energy Corp.
License Number: 0114674
License Date: 1985-05-16
License Status: Issued
Spud Date: 1985-05-22
Final Drill Date: 1985-05-28
Well Total Depth: 520.00 m
Surface Hole Latitude: 53.861937
Surface Hole Longitude: -110.457507

For data sources see[1][2]

Well History

Date Event
1985-05-16 Obtained License
1985-05-23 Surface Casing Operation Performed
1985-05-28 Finished Drilling
1985-05-28 Well Log Performed
1985-05-29 Well Log Performed
1985-05-30 Drill Stem Test Performed
1985-05-31 Production Casing Operation Performed
1985-05-31 Rig Released
1985-08-02 Well Log Performed
1985-08-03 Perforation Treatment Performed - Jet Perforation
1985-08-03 Well Log Performed
1985-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-08-23 Perforation Treatment Performed - Jet Perforation
1985-08-23 Plug Back Performed
1985-08-23 Well Log Performed
1985-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-24 Perforation Treatment Performed - Cement Squeeze
1985-08-26 Perforation Treatment Performed - Jet Perforation
1985-08-26 Well Log Performed
1988-10-03 Perforation Treatment Performed - Jet Perforation
1988-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-11 Perforation Treatment Performed - Cement Squeeze
1988-10-14 Perforation Treatment Performed - Jet Perforation
1988-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-25 Perforation Treatment Performed - Cement Squeeze
1994-08-25 Plug Back Performed
1994-08-29 Perforation Treatment Performed - Jet Perforation
1994-08-30 Well Mode changed to Drilled and Cased
1995-03-31 Well Began Production
1995-03-31 Well Fluid changed to Gas
1995-03-31 Well Mode changed to Flowing
2003-01-01 Well Fluid changed to Gas
2003-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-08-03 Perforation 504.50 505.50 13
1988-10-11 Cement Squeeze 450.50 457.00 0
1988-10-14 Perforation 450.50 452.50 13
1988-10-18 Acid Treatment 450.50 452.50 0
1994-08-25 Cement Squeeze 450.50 452.50 0
1994-08-29 Perforation 504.50 505.50 13
1994-08-29 Perforation 508.50 511.50 13
1985-08-03 Perforation 508.50 511.50 13
1985-08-23 Packing Device Capped w/Cement 499.00 499.00 0
1985-08-23 Perforation 452.00 453.00 13
1985-08-24 Acid Treatment 452.00 453.00 0
1985-08-24 Cement Squeeze 452.00 453.00 0
1985-08-26 Perforation 450.50 452.50 26
1988-10-03 Perforation 456.00 457.00 13
1988-10-04 Acid Treatment 456.00 457.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 6436 0.0 0.0 0.0
1996 8536 0.0 0.0 0.0
1997 8535 0.0 0.0 0.0
1998 8673 0.0 0.0 0.0
1999 8722 0.0 0.0 0.0
2000 8713 0.0 0.0 0.0
2001 8604 0.0 0.0 0.0
2002 8635 0.0 0.0 0.0
2003 8650 0.0 0.0 0.0
2004 8754 0.0 0.0 0.0
2005 8679 0.0 0.0 0.0
2006 8758 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8303 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8780 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 4655 0.0 0.0 0.0
2017 8598 0.0 0.0 0.0
2018 4294 0.0 0.0 0.0

For data sources see[5]

References