X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564053004000

Well Details

Well ID: 0564053004000
Loading map...
Location: 00/04-30-056-05W4/0
Location Alias: 00/04-30-56-05 W4M
Location Alias 2: 00/04-30-056-05 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 05
Section: 30
County/Municipality: County of St. Paul No. 19
Well Name: GEAR LIND 4-30-56-5
Operator Name: Gear Energy Ltd.
License Number: 0237474
License Date: 2000-05-17
License Status: Suspension
Spud Date: 2000-07-26
Final Drill Date: 2000-07-31
Well Total Depth: 527.00 m
Surface Hole Latitude: 53.861715
Surface Hole Longitude: -110.740279

For data sources see[1][2]

Well History

Date Event
2000-05-17 Obtained License
2000-07-27 Surface Casing Operation Performed
2000-07-29 Direction Drilling Operation Performed - Deviate
2000-07-31 Finished Drilling
2000-07-31 Well Log Performed
2000-08-01 Production Casing Operation Performed
2000-08-01 Rig Released
2000-08-01 Well Mode changed to Drilled and Cased
2000-08-11 Perforation Treatment Performed - Jet Perforation
2000-08-11 Well Began Production
2000-08-11 Well Fluid changed to Crude Bitumen
2000-08-11 Well Mode changed to Pumping
2001-03-05 Well Fluid changed to Crude Bitumen
2001-03-05 Well Mode changed to Pumping
2001-03-06 Perforation Treatment Performed - Jet Perforation
2001-03-06 Well Fluid changed to Crude Bitumen
2001-03-06 Well Mode changed to Pumping
2002-10-01 Well Fluid changed to Crude Bitumen
2002-10-01 Well Mode changed to Pumping
2002-11-04 Perforation Treatment Performed - Jet Perforation
2002-11-04 Well Log Performed
2004-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-07-28 Plug Back Performed
2004-07-28 Well Fluid changed to Crude Bitumen
2004-07-28 Well Mode changed to Abandoned Zone
2004-07-29 Perforation Treatment Performed - Jet Perforation
2004-07-29 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-07-29 98.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-08-11 Perforation 482.50 486.50 26
2001-03-06 Perforation 470.00 474.00 13
2001-03-06 Perforation 470.00 474.00 13
2002-11-04 Perforation 458.50 461.80 26
2004-07-28 Packing Device Capped w/Cement 448.00 456.00 0
2004-07-29 Perforation 425.50 428.00 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 3342 0.0 0.0 0.0
2001 4805 0.0 0.0 0.0
2002 2804 0.0 0.0 0.0
2003 8073 0.0 0.0 0.0

For data sources see[6]

References