X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564060910002

Well Details

Well ID: 0564060910002
Loading map...
Location: 00/10-09-056-06W4/2
Location Alias: 00/10-09-56-06 W4M
Location Alias 2: 00/10-09-056-06 W4/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 06
Section: 09
County/Municipality: County of St. Paul No. 19
Well Name: AMOCO LINDBERGH 10D-9-56-6
Operator Name: Canadian Natural Resources Limited
License Number: 0088168
License Date: 1981-01-09
License Status: Abandoned
Spud Date: 1981-02-01
Final Drill Date: 1981-02-04
Well Total Depth: 616.00 m
Surface Hole Latitude: 53.827592
Surface Hole Longitude: -110.830992

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-01-09 Obtained License
1981-02-04 Finished Drilling
1981-02-04 Well Mode changed to Drilled and Cased
1981-02-05 Production Casing Operation Performed
1981-02-17 Perforation Treatment Performed - Jet Perforation
1983-02-02 Perforation Treatment Performed - Jet Perforation
1986-01-10 Perforation Treatment Performed - Abrasa-Jet Perforation
1986-01-10 Well Log Performed
1994-08-09 Perforation Treatment Performed - Jet Perforation
1996-06-09 Perforation Treatment Performed - Jet Perforation
1996-06-09 Well Began Production
1996-06-09 Well Fluid changed to Crude Bitumen
1996-06-09 Well Log Performed
1996-06-09 Well Mode changed to Pumping
2008-06-30 Well Fluid changed to Crude Bitumen
2008-06-30 Well Mode changed to Suspended
2011-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-22 Plug Back Performed
2011-03-22 Well Fluid changed to Crude Bitumen
2011-03-22 Well Mode changed to Abandoned Zone
2011-03-25 Well Abandoned
2011-03-25 Well Fluid changed to Crude Bitumen
2011-03-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-02-17 Perforation 581.50 585.50 13
1983-02-02 Perforation 581.50 585.50 13
1983-02-02 Perforation 589.00 592.00 13
1983-02-02 Perforation 596.50 598.00 13
1986-01-10 Hydra Jet Perforation 582.00 583.50 13
1994-08-09 Perforation 581.00 584.50 13
1996-06-09 Perforation 462.00 465.00 26
2011-03-22 Packing Device Capped w/Cement 442.00 450.00 0
2011-03-22 Packing Device Capped w/Cement 465.00 570.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 4462 0.0 0.0 0.0
1997 8510 0.0 0.0 0.0
1998 8622 0.0 0.0 0.0
1999 8321 0.0 0.0 0.0
2000 8016 0.0 0.0 0.0
2001 8664 0.0 0.0 0.0
2002 8691 0.0 0.0 0.0
2003 8352 0.0 0.0 0.0
2004 8089 0.0 0.0 0.0
2005 6632 0.0 0.0 0.0
2006 7260 0.0 0.0 0.0

For data sources see[5]

References