X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564071206020

Well Details

Well ID: 0564071206020
Loading map...
Location: 02/06-12-056-07W4/0
Location Alias: 02/06-12-56-07 W4M
Location Alias 2: 02/06-12-056-07 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 07
Section: 12
County/Municipality: County of St. Paul No. 19
Well Name: AMOCO 03 ST. PAUL 6B-12CU-56-7
Operator Name: Canadian Natural Resources Limited
License Number: 0144194
License Date: 1990-05-18
License Status: Suspension
Spud Date: 1990-06-22
Final Drill Date: 1990-06-23
Well Total Depth: 694.00 m
Surface Hole Latitude: 53.820351
Surface Hole Longitude: -110.909269

For data sources see[1][2]

Well History

Date Event
1990-05-18 Obtained License
1990-06-22 Direction Drilling Operation Performed - Deviate
1990-06-23 Finished Drilling
1990-06-23 Well Log Performed
1990-06-23 Well Mode changed to Drilled and Cased
1990-06-24 Production Casing Operation Performed
1990-06-24 Well Log Performed
1990-06-25 Rig Released
1990-06-29 Well Log Performed
1990-07-05 Well Log Performed
1990-07-16 Perforation Treatment Performed - Jet Perforation
1990-07-16 Well Log Performed
1990-07-20 Well Began Production
1990-07-20 Well Fluid changed to Crude Bitumen
1990-07-20 Well Mode changed to Pumping
1990-11-30 Well Fluid changed to Crude Bitumen
1990-11-30 Well Mode changed to Suspended
1993-09-01 Well Fluid changed to Crude Bitumen
1993-09-01 Well Mode changed to Pumping
1993-09-08 Perforation Treatment Performed - Jet Perforation
1993-09-08 Well Log Performed
2002-11-30 Well Fluid changed to Crude Bitumen
2002-11-30 Well Mode changed to Suspended
2003-02-21 Perforation Treatment Performed - Cement Plug
2003-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-22 Plug Back Performed
2003-02-22 Well Fluid changed to Crude Bitumen
2003-02-22 Well Mode changed to Abandoned Zone
2003-02-23 Perforation Treatment Performed - Jet Perforation
2006-02-23 Perforation Treatment Performed - Chemical Squeeze
2010-11-05 Perforation Treatment Performed - Chemical Squeeze
2012-06-21 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-06-22 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-07-16 Perforation 643.50 644.90 26
2012-06-21 Perforation 568.50 574.00 26
1990-07-16 Perforation 646.00 647.50 26
1993-09-08 Perforation 643.50 644.90 13
1993-09-08 Perforation 646.00 647.50 13
2003-02-21 Cement Plug 647.00 675.00 0
2003-02-22 Packing Device Capped w/Cement 633.00 641.00 0
2003-02-23 Perforation 556.50 560.00 26
2006-02-23 Chemical Squeeze 556.50 560.00 0
2010-11-05 Chemical Squeeze 556.50 560.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 1237 0.0 0.0 0.0
1993 2556 0.0 0.0 0.0
1994 7038 0.0 0.0 0.0
1995 8116 0.0 0.0 0.0
1996 8679 0.0 0.0 0.0
1997 7661 0.0 0.0 0.0
1998 8755 0.0 0.0 0.0
1999 8719 0.0 0.0 0.0
2000 8638 0.0 0.0 0.0
2001 8737 0.0 0.0 0.0
2002 3951 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References