X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564071302003

Well Details

Well ID: 0564071302003
Loading map...
Location: 00/02-13-056-07W4/3
Location Alias: 00/02-13-56-07 W4M
Location Alias 2: 00/02-13-056-07 W4/03
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 07
Section: 13
County/Municipality: County of St. Paul No. 19
Well Name: NORWEST ST. PAUL 2A-13-56-7
Operator Name: Canadian Natural Resources Limited
License Number: 0145426
License Date: 1990-09-17
License Status: Suspension
Spud Date: 1990-09-23
Final Drill Date: 1990-09-26
Well Total Depth: 640.00 m
Surface Hole Latitude: 53.831998
Surface Hole Longitude: -110.905910

For data sources see[1][2]

Well History

Date Event
1990-09-17 Obtained License
1990-09-24 Surface Casing Operation Performed
1990-09-25 Direction Drilling Operation Performed - Deviate
1990-09-26 Finished Drilling
1990-09-26 Well Log Performed
1990-09-26 Well Mode changed to Drilled and Cased
1990-09-27 Production Casing Operation Performed
1990-09-27 Rig Released
1990-09-28 Well Log Performed
1990-10-11 Perforation Treatment Performed - Jet Perforation
1990-10-11 Well Log Performed
2000-04-26 Perforation Treatment Performed - Casing Patch (Over Perfs)
2000-04-26 Perforation Treatment Performed - Jet Perforation
2000-04-26 Well Log Performed
2006-02-07 Perforation Treatment Performed - Jet Perforation
2006-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-09 Perforation Treatment Performed - Cement Plug
2006-02-09 Plug Back Performed
2006-02-11 Perforation Treatment Performed - Jet Perforation
2006-02-11 Well Log Performed
2006-02-14 Well Began Production
2006-02-14 Well Fluid changed to Crude Bitumen
2006-02-14 Well Mode changed to Pumping
2008-06-30 Well Fluid changed to Crude Bitumen
2008-06-30 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-09-25 108.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-10-11 Perforation 504.80 509.30 26
2000-04-26 Casing Patch 493.20 521.80 0
2000-04-26 Perforation 590.00 593.00 20
2006-02-07 Perforation 504.80 509.30 26
2006-02-09 Packing Device Capped w/Cement 476.00 490.00 0
2006-02-09 Cement Plug 531.00 610.00 0
2006-02-11 Perforation 447.00 449.00 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 5884 0.0 0.0 0.0
2007 0 0.0 0.0 0.0

For data sources see[6]

References