If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0564150306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.807231,"lon":-112.150287,"icon":""}]} |
| Location: 00/06-03-056-15W4/0 | |
| Location Alias: 00/06-03-56-15 W4M | |
| Location Alias 2: 00/06-03-056-15 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 056 | |
| Meridian: 4 | |
| Range: 15 | |
| Section: 03 | |
| County/Municipality: County of Two Hills No. 21 | |
| Well Name: PEOC WILDON 6-3-56-15 | |
| Operator Name: Sequoia Resources Corp. | |
| License Number: 0026816 | |
| License Date: 1964-09-17 | |
| License Status: Suspension | |
| Spud Date: 1964-09-25 | |
| Final Drill Date: 1964-10-08 | |
| Well Total Depth: 658.70 m | |
| Surface Hole Latitude: 53.807231 | |
| Surface Hole Longitude: -112.150287 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1964-09-17 | Obtained License |
| 1964-10-01 | Drill Stem Test Performed |
| 1964-10-02 | Drill Stem Test Performed |
| 1964-10-03 | Drill Stem Test Performed |
| 1964-10-04 | Drill Stem Test Performed |
| 1964-10-06 | Production Casing Operation Performed |
| 1964-10-08 | Finished Drilling |
| 1964-10-08 | Well Mode changed to Drilled and Cased |
| 1964-10-14 | Perforation Treatment Performed - Open-Hole Completion |
| 1964-11-02 | Well Began Production |
| 1964-11-02 | Well Fluid changed to Gas |
| 1964-11-02 | Well Mode changed to Flowing |
| 1966-07-11 | Perforation Treatment Performed - Cement Plug |
| 1966-07-11 | Well Fluid changed to Gas |
| 1966-07-11 | Well Mode changed to Abandoned Zone |
| 1966-07-13 | Perforation Treatment Performed - Bullet Perforation |
| 1967-06-07 | Perforation Treatment Performed - Cement Plug |
| 1967-06-08 | Perforation Treatment Performed - Jet Perforation |
| 1968-10-04 | Perforation Treatment Performed - Jet Perforation |
| 1992-04-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1992-04-06 | Perforation Treatment Performed - Jet Perforation |
| 1992-04-06 | Plug Back Performed |
| 1992-04-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1992-04-07 | Perforation Treatment Performed - Jet Perforation |
| 1992-04-08 | Perforation Treatment Performed - Remedial Casing |
| 1993-04-03 | Well Log Performed |
| 1993-04-06 | Well Log Performed |
| 1993-10-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1993-10-15 | Perforation Treatment Performed - Jet Perforation |
| 1993-10-15 | Perforation Treatment Performed - Remedial Casing |
| 1995-09-12 | Perforation Treatment Performed - Jet Perforation |
| 1995-11-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-09-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-09-22 | Perforation Treatment Performed - Remedial Casing |
| 1997-09-30 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1964-10-14 | Open Hole/Barefoot Completion | 623.30 | 658.70 | 0 |
| 1992-04-07 | Packing Device Capped w/Cement | 338.00 | 346.00 | 0 |
| 1992-04-07 | Perforation | 189.00 | 189.50 | 13 |
| 1992-04-08 | Remedial Casing Cementing | 189.00 | 189.50 | 0 |
| 1993-10-15 | Perforation | 350.00 | 350.50 | 13 |
| 1993-10-15 | Perforation | 493.80 | 495.90 | 10 |
| 1993-10-15 | Acid Treatment | 493.80 | 495.90 | 0 |
| 1993-10-15 | Remedial Casing Cementing | 493.80 | 495.90 | 0 |
| 1993-10-15 | Remedial Casing Cementing | 350.00 | 350.50 | 0 |
| 1995-09-12 | Perforation | 189.00 | 189.50 | 13 |
| 1995-11-08 | Acid Treatment | 189.00 | 189.50 | 0 |
| 1966-07-11 | Cement Plug | 612.60 | 658.70 | 0 |
| 1997-09-22 | Acid Treatment | 189.00 | 189.50 | 0 |
| 1997-09-22 | Remedial Casing Cementing | 189.00 | 189.50 | 0 |
| 1997-09-30 | Perforation | 533.00 | 535.80 | 13 |
| 1997-09-30 | Perforation | 493.50 | 494.50 | 13 |
| 1966-07-13 | Bullet Perforation | 568.80 | 570.60 | 7 |
| 1967-06-07 | Cement Plug | 554.40 | 585.20 | 0 |
| 1967-06-08 | Perforation | 538.30 | 540.10 | 7 |
| 1968-10-04 | Perforation | 493.80 | 495.90 | 10 |
| 1992-04-06 | Packing Device Capped w/Cement | 519.00 | 527.00 | 0 |
| 1992-04-06 | Packing Device Capped w/Cement | 480.00 | 488.00 | 0 |
| 1992-04-06 | Perforation | 350.00 | 350.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]