If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0564200312000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.820719,"lon":-112.900304,"icon":""}]} |
| Location: 00/12-03-056-20W4/0 | |
| Location Alias: 00/12-03-56-20 W4M | |
| Location Alias 2: 00/12-03-056-20 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 056 | |
| Meridian: 4 | |
| Range: 20 | |
| Section: 03 | |
| County/Municipality: Lamont County | |
| Well Name: TAC HZ REDWATER 12-3-56-20 | |
| Operator Name: Tamarack Acquisition Corp. | |
| License Number: 0448970 | |
| License Date: 2012-10-03 | |
| License Status: Issued | |
| Spud Date: 2012-10-17 | |
| Final Drill Date: 2012-10-20 | |
| Well Total Depth: 1399.00 m | |
| Surface Hole Latitude: 53.820719 | |
| Surface Hole Longitude: -112.900304 |
| Date | Event |
|---|---|
| 2012-10-03 | Obtained License |
| 2012-10-18 | Direction Drilling Operation Performed - Deviate |
| 2012-10-18 | Surface Casing Operation Performed |
| 2012-10-18 | Well Log Performed |
| 2012-10-19 | Direction Drilling Operation Performed - Horizontal |
| 2012-10-20 | Finished Drilling |
| 2012-10-20 | Production Casing Operation Performed |
| 2012-10-20 | Well Mode changed to Drilled and Cased |
| 2012-10-21 | Rig Released |
| 2012-11-12 | Well Log Performed |
| 2012-11-18 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2012-11-18 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-11-19 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2012-11-19 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-12-02 | Well Began Production |
| 2012-12-02 | Well Fluid changed to Crude Oil |
| 2012-12-02 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-10-17 | Precision Drilling Corporation | 135 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-10-18 | 406.50 | Deviate (5 - 79 degrees) |
| 2012-10-19 | 817.90 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-11-18 | Hydra Jet Perforation | 1369.50 | 1369.60 | 0 |
| 2012-11-19 | Multi-Stage Fracture | 1185.80 | 1185.90 | 0 |
| 2012-11-19 | Hydra Jet Perforation | 1134.00 | 1134.10 | 0 |
| 2012-11-19 | Multi-Stage Fracture | 1134.00 | 1134.10 | 0 |
| 2012-11-19 | Hydra Jet Perforation | 1089.50 | 1089.60 | 0 |
| 2012-11-19 | Multi-Stage Fracture | 1089.50 | 1089.60 | 0 |
| 2012-11-19 | Hydra Jet Perforation | 1044.50 | 1044.60 | 0 |
| 2012-11-19 | Multi-Stage Fracture | 1044.50 | 1044.60 | 0 |
| 2012-11-19 | Hydra Jet Perforation | 999.10 | 999.20 | 0 |
| 2012-11-19 | Multi-Stage Fracture | 999.10 | 999.20 | 0 |
| 2012-11-19 | Hydra Jet Perforation | 947.50 | 947.60 | 0 |
| 2012-11-18 | Multi-Stage Fracture | 1369.50 | 1369.60 | 0 |
| 2012-11-19 | Multi-Stage Fracture | 947.50 | 947.60 | 0 |
| 2012-11-19 | Hydra Jet Perforation | 905.50 | 905.60 | 0 |
| 2012-11-19 | Multi-Stage Fracture | 905.50 | 905.60 | 0 |
| 2012-11-19 | Hydra Jet Perforation | 860.00 | 860.10 | 0 |
| 2012-11-19 | Multi-Stage Fracture | 860.00 | 860.10 | 0 |
| 2012-11-18 | Hydra Jet Perforation | 1317.60 | 1317.70 | 0 |
| 2012-11-18 | Multi-Stage Fracture | 1317.60 | 1317.70 | 0 |
| 2012-11-18 | Hydra Jet Perforation | 1275.50 | 1275.60 | 0 |
| 2012-11-18 | Multi-Stage Fracture | 1275.50 | 1275.60 | 0 |
| 2012-11-18 | Hydra Jet Perforation | 1230.50 | 1230.60 | 0 |
| 2012-11-18 | Multi-Stage Fracture | 1230.50 | 1230.60 | 0 |
| 2012-11-19 | Hydra Jet Perforation | 1185.80 | 1185.90 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 712 | 0.0 | 0.0 | 0.0 |
| 2013 | 8473 | 0.0 | 0.0 | 0.0 |
| 2014 | 8447 | 0.0 | 0.0 | 0.0 |
| 2015 | 8715 | 0.0 | 0.0 | 0.0 |
| 2016 | 8775 | 0.0 | 0.0 | 0.0 |
| 2017 | 8401 | 0.0 | 0.0 | 0.0 |
| 2018 | 7755 | 0.0 | 0.0 | 0.0 |
| 2019 | 8008 | 0.0 | 0.0 | 0.0 |
| 2020 | 1744 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-10-21 | No Incident Encountered | 0.00 | 0.00 |
| 2012-11-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]