X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564240305000

Well Details

Well ID: 0564240305000
Loading map...
Location: 00/05-03-056-24W4/0
Location Alias: 00/05-03-56-24 W4M
Location Alias 2: 00/05-03-056-24 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 24
Section: 03
County/Municipality: Sturgeon County
Well Name: RIO BRAVO CARRUTHERS 5-3
Operator Name: ExxonMobil Canada Resources Company
License Number: 0000924
License Date: 1949-11-22
License Status: Abandoned
Spud Date: 1949-11-29
Final Drill Date: 1949-12-31
Well Total Depth: 1274.70 m
Surface Hole Latitude: 53.809110
Surface Hole Longitude: -113.492865

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-11-22 Obtained License
1949-12-06 Drill Stem Test Performed
1949-12-12 Drill Stem Test Performed
1949-12-13 Drill Stem Test Performed
1949-12-15 Drill Stem Test Performed
1949-12-16 Drill Stem Test Performed
1949-12-18 Drill Stem Test Performed
1949-12-20 Drill Stem Test Performed
1949-12-21 Drill Stem Test Performed
1949-12-22 Drill Stem Test Performed
1949-12-25 Production Casing Operation Performed
1949-12-31 Finished Drilling
1949-12-31 Well Mode changed to Drilled and Cased
1950-01-01 Drill Stem Test Performed
1950-01-02 Perforation Treatment Performed - Bullet Perforation
1950-01-03 Drill Stem Test Performed
1950-01-03 Perforation Treatment Performed - Bullet Perforation
1950-01-03 Perforation Treatment Performed - Cement Squeeze
1950-01-06 Drill Stem Test Performed
1950-01-06 Perforation Treatment Performed - Bullet Perforation
1950-01-09 Perforation Treatment Performed - Jet Perforation
1950-01-10 Perforation Treatment Performed - Acid Wash - No Pressure
1950-01-10 Well Began Production
1950-01-10 Well Fluid changed to Crude Oil
1950-01-10 Well Mode changed to Flowing
1950-10-27 Well Fluid changed to Crude Oil
1950-10-27 Well Mode changed to Pumping
1973-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-10-19 Well Fluid changed to Crude Oil
1981-10-19 Well Mode changed to Suspended
1982-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-09-24 Well Abandoned
1982-09-24 Well Fluid changed to Crude Oil
1982-09-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-01-02 Bullet Perforation 822.70 823.00 0
1950-01-03 Cement Squeeze 822.70 823.00 0
1950-01-03 Cement Squeeze 822.70 823.00 0
1950-01-03 Bullet Perforation 1180.80 1181.10 13
1950-01-06 Bullet Perforation 1188.40 1188.70 13
1950-01-09 Perforation 1182.00 1188.10 20
1950-01-10 Acid Wash 1180.80 1188.70 0
1973-09-01 Acid Treatment 1180.80 1188.70 0
1982-09-24 Packing Device Capped w/Cement 1169.60 1179.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5280 0.0 0.0 0.0
1968 7551 0.0 0.0 0.0
1969 6820 0.0 0.0 0.0
1970 5777 0.0 0.0 0.0
1971 6224 0.0 0.0 0.0
1972 6383 0.0 0.0 0.0
1973 7599 0.0 0.0 0.0
1974 8169 0.0 0.0 0.0
1975 7773 0.0 0.0 0.0
1976 8617 0.0 0.0 0.0
1977 8542 0.0 0.0 0.0
1978 8663 0.0 0.0 0.0
1979 8411 0.0 0.0 0.0
1980 8474 0.0 0.0 0.0
1981 6997 0.0 0.0 0.0

For data sources see[5]

References