X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564240408002

Well Details

Well ID: 0564240408002
Loading map...
Location: 00/08-04-056-24W4/2
Location Alias: 00/08-04-56-24 W4M
Location Alias 2: 00/08-04-056-24 W4/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 24
Section: 04
County/Municipality: Sturgeon County
Well Name: DAVIS 8-4 S.W.D.
Operator Name: ExxonMobil Canada Resources Company
License Number: 0001547
License Date: 1950-06-01
License Status: RecCertified
Spud Date: 1950-06-07
Final Drill Date: 1950-06-24
Well Total Depth: 1284.70 m
Surface Hole Latitude: 53.809551
Surface Hole Longitude: -113.498561

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-06-01 Obtained License
1950-06-24 Drill Stem Test Performed
1950-06-24 Finished Drilling
1950-06-30 Production Casing Operation Performed
1950-07-02 Perforation Treatment Performed - Acid Wash - No Pressure
1950-07-02 Perforation Treatment Performed - Bullet Perforation
1950-09-11 Perforation Treatment Performed - Bullet Perforation
1950-09-12 Perforation Treatment Performed - Cement Squeeze
1950-09-29 Perforation Treatment Performed - Bullet Perforation
1950-09-29 Perforation Treatment Performed - Cement Squeeze
1950-10-07 Perforation Treatment Performed - Bullet Perforation
1950-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-06-11 Drill Stem Test Performed
1951-06-17 Drill Stem Test Performed
1951-06-18 Drill Stem Test Performed
1951-09-24 Drill Stem Test Performed
1954-03-25 Perforation Treatment Performed - Jet Perforation
1954-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-09-13 Perforation Treatment Performed - Jet Perforation
1954-09-13 Well Mode changed to Drilled and Cased
1955-11-10 Well Fluid changed to Crude Oil
1955-11-10 Well Mode changed to Potential
1955-11-11 Perforation Treatment Performed - Cement Squeeze
1955-11-11 Well Fluid changed to Crude Oil
1955-11-11 Well Mode changed to Abandoned
1955-11-16 Perforation Treatment Performed - Bullet Perforation
1955-11-16 Perforation Treatment Performed - Cement Squeeze
1955-11-17 Perforation Treatment Performed - Acid Wash - No Pressure
1963-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-02-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-07-02 Bullet Perforation 1185.40 1190.90 10
1950-10-09 Acid Treatment 1189.30 1191.50 0
1954-03-25 Perforation 1186.00 1189.60 13
1954-03-26 Acid Treatment 1186.00 1189.60 0
1954-09-13 Perforation 832.70 834.50 13
1955-11-11 Cement Squeeze 832.70 834.50 0
1955-11-16 Cement Squeeze 1186.00 1191.50 0
1955-11-16 Bullet Perforation 1211.60 1222.20 13
1955-11-17 Acid Wash 1211.60 1222.20 0
1963-02-18 Acid Treatment 1211.60 1222.20 0
1966-08-22 Acid Treatment 1211.60 1222.20 0
1950-07-02 Acid Wash 1185.40 1190.90 0
1968-05-28 Acid Treatment 1211.60 1222.20 0
1984-02-09 Packing Device Capped w/Cement 1195.00 1203.00 0
1950-09-11 Bullet Perforation 1196.30 1196.60 7
1950-09-11 Bullet Perforation 1183.50 1183.80 13
1950-09-12 Cement Squeeze 1183.50 1196.60 0
1950-09-29 Bullet Perforation 1192.40 1194.20 13
1950-09-29 Cement Squeeze 1192.40 1194.20 0
1950-10-07 Bullet Perforation 1189.30 1191.50 13
1950-10-08 Acid Treatment 1189.30 1191.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References