X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564242310000

Well Details

Well ID: 0564242310000
Loading map...
Location: 00/10-23-056-24W4/0
Location Alias: 00/10-23-56-24 W4M
Location Alias 2: 00/10-23-056-24 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 24
Section: 23
County/Municipality: Sturgeon County
Well Name: HAZELWOOD FBA 10-23-56-24
Operator Name: Hazelwood Energy Limited
License Number: 0035071
License Date: 1968-10-29
License Status: Re-Entered
Spud Date: 1968-11-06
Final Drill Date: 1968-11-23
Well Total Depth: 1525.50 m
Surface Hole Latitude: 53.856631
Surface Hole Longitude: -113.455340

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-10-29 Obtained License
1968-11-13 Drill Stem Test Performed
1968-11-14 Drill Stem Test Performed
1968-11-23 Finished Drilling
1968-11-23 Well Mode changed to Drilled and Cased
1968-11-25 Drill Stem Test Performed
1968-11-27 Production Casing Operation Performed
1969-01-15 Perforation Treatment Performed - Jet Perforation
1969-01-17 Perforation Treatment Performed - Jet Perforation
1969-02-18 Well Began Production
1969-02-18 Well Fluid changed to Crude Oil
1969-02-18 Well Mode changed to Flowing
1970-03-05 Perforation Treatment Performed - Jet Perforation
1971-05-11 Well Fluid changed to Crude Oil
1971-05-11 Well Mode changed to Suspended
1983-06-08 Well Fluid changed to Crude Oil
1983-06-08 Well Mode changed to Flowing
1987-05-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-05-13 Perforation Treatment Performed - Jet Perforation
1987-05-13 Well Log Performed
1993-07-08 Well Log Performed
1993-07-16 Well Log Performed
1994-01-13 Well Abandoned
1994-02-01 Well Fluid changed to Crude Oil
1994-02-01 Well Mode changed to Suspended
1994-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-12 Plug Back Performed
1994-02-12 Well Fluid changed to Crude Oil
1994-02-12 Well Log Performed
1994-02-12 Well Mode changed to Abandoned and Re-entered
2005-11-21 Well Log Performed
2005-11-27 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-01-15 Perforation 1064.10 1064.70 3
1969-01-17 Perforation 1067.10 1067.70 3
1970-03-05 Perforation 1057.70 1058.90 7
1970-03-05 Perforation 1057.00 1058.90 7
1970-03-05 Perforation 1061.30 1063.10 7
1987-05-13 Perforation 1051.00 1054.00 13
1987-05-13 Acid Treatment 1051.00 1067.70 0
1994-02-12 Packing Device Capped w/Cement 1025.00 1033.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 2466 0.0 0.0 0.0
1970 312 0.0 0.0 0.0
1983 4890 0.0 0.0 0.0
1984 8353 0.0 0.0 0.0
1985 6778 0.0 0.0 0.0
1986 8426 0.0 0.0 0.0
1987 6148 0.0 0.0 0.0
1988 8156 0.0 0.0 0.0
1989 8589 0.0 0.0 0.0
1990 8203 0.0 0.0 0.0
1991 8001 0.0 0.0 0.0
1992 3476 0.0 0.0 0.0

For data sources see[5]

References