If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0564253016000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.872735,"lon":-113.695946,"icon":""}]} |
Location: 00/16-30-056-25W4/0 | |
Location Alias: 00/16-30-56-25 W4M | |
Location Alias 2: 00/16-30-056-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 4 | |
Range: 25 | |
Section: 30 | |
County/Municipality: Sturgeon County | |
Well Name: PER MORINVILLE 16-30-56-25 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0141509 | |
License Date: 1989-10-25 | |
License Status: Abandoned | |
Spud Date: 1989-10-29 | |
Final Drill Date: 1989-11-03 | |
Well Total Depth: 1335.00 m | |
Surface Hole Latitude: 53.872735 | |
Surface Hole Longitude: -113.695946 |
Date | Event |
---|---|
1989-10-25 | Obtained License |
1989-10-29 | Water Flow Occurred |
1989-10-30 | Surface Casing Operation Performed |
1989-11-01 | Kick Occurred |
1989-11-03 | Finished Drilling |
1989-11-03 | Well Mode changed to Drilled and Cased |
1989-11-04 | Well Log Performed |
1989-11-05 | Drill Stem Test Performed |
1989-11-06 | Drill Stem Test Performed |
1989-11-07 | Production Casing Operation Performed |
1989-11-07 | Rig Released |
1989-12-16 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1989-12-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-02-04 | Well Began Production |
1990-02-04 | Well Fluid changed to Crude Oil |
1990-02-04 | Well Mode changed to Pumping |
1990-03-14 | Perforation Treatment Performed - Open-Hole Completion |
1990-03-15 | Perforation Treatment Performed - Jet Perforation |
1990-03-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-03-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-03-19 | Plug Back Performed |
1990-03-19 | Well Abandoned |
1990-03-19 | Well Fluid changed to Crude Oil |
1990-03-19 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-12-16 | Hydra Jet Perforation | 1331.00 | 1333.00 | 0 |
1989-12-19 | Acid Treatment | 1331.00 | 1333.00 | 0 |
1990-03-14 | Open Hole/Barefoot Completion | 1334.00 | 1335.00 | 0 |
1990-03-15 | Perforation | 1330.60 | 1332.10 | 14 |
1990-03-17 | Acid Treatment | 1330.60 | 1335.00 | 0 |
1990-03-19 | Packing Device Capped w/Cement | 1307.00 | 1315.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 700 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1989-10-29 | Water Flow | 246.00 | 246.00 |
1989-11-01 | Kick | 1085.00 | 1085.00 |
For data sources see[6]