X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565043110000

Well Details

Well ID: 0565043110000
Loading map...
Location: 00/10-31-056-04W5/0
Location Alias: 00/10-31-56-04 W5M
Location Alias 2: 00/10-31-056-04 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 04
Section: 31
County/Municipality: Lac Ste. Anne County
Well Name: C&E BALLANTINE 10-31-56-4
Operator Name: ExxonMobil Canada Resources Company
License Number: 0027898
License Date: 1965-03-04
License Status: RecCertified
Spud Date: 1965-03-18
Final Drill Date: 1965-04-05
Well Total Depth: 1453.90 m
Surface Hole Latitude: 53.884295
Surface Hole Longitude: -114.581522

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-03-04 Obtained License
1965-03-18 Lost Circulation Occurred
1965-03-28 Drill Stem Test Performed
1965-03-30 Drill Stem Test Performed
1965-04-05 Finished Drilling
1965-04-07 Drill Stem Test Performed
1965-04-09 Production Casing Operation Performed
1965-07-20 Perforation Treatment Performed - Jet Perforation
1965-07-22 Perforation Treatment Performed - Cement Squeeze
1965-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-07-24 Perforation Treatment Performed - Fractured
1965-07-24 Perforation Treatment Performed - Jet Perforation
1965-07-31 Perforation Treatment Performed - Abrasa-Jet Perforation
1965-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-08-01 Perforation Treatment Performed - Fractured
1965-08-04 Perforation Treatment Performed - Cement Plug
1965-08-04 Well Abandoned
1965-08-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-07-20 Perforation 1329.20 1329.50 13
1965-08-04 Cement Plug 1329.50 1331.40 0
1965-07-20 Perforation 1331.40 1331.70 13
1965-07-22 Cement Squeeze 1329.20 1331.70 0
1965-07-24 Perforation 1329.50 1331.40 7
1965-07-24 Acid Treatment 1329.50 1331.40 0
1965-07-24 Fracture 1329.50 1331.40 0
1965-07-31 Hydra Jet Perforation 1330.50 1330.50 0
1965-08-01 Acid Treatment 1329.50 1331.40 0
1965-08-01 Fracture 1329.50 1331.40 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1965-03-18 Lost Circulation 0.10 14.60

For data sources see[5]

References