X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565052506002

Well Details

Well ID: 0565052506002
Loading map...
Location: 00/06-25-056-05W5/2
Location Alias: 00/06-25-56-05 W5M
Location Alias 2: 00/06-25-056-05 W5/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 05
Section: 25
County/Municipality: Lac Ste. Anne County
Well Name: JOURNEY CHERHILL 6-25-56-5
Operator Name: Journey Energy Inc.
License Number: 0065595
License Date: 1977-09-07
License Status: Suspension
Spud Date: 1977-09-22
Final Drill Date: 1977-09-28
Well Total Depth: 1356.40 m
Surface Hole Latitude: 53.864911
Surface Hole Longitude: -114.614217

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-09-07 Obtained License
1977-09-28 Finished Drilling
1977-09-28 Well Mode changed to Drilled and Cased
1977-09-29 Drill Stem Test Performed
1977-09-30 Drill Stem Test Performed
1977-10-01 Production Casing Operation Performed
1977-10-12 Perforation Treatment Performed - Jet Perforation
1977-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-12-28 Perforation Treatment Performed - Jet Perforation
1982-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-24 Perforation Treatment Performed - Jet Perforation
1982-07-26 Perforation Treatment Performed - Cement Squeeze
1999-05-25 Well Log Performed
1999-05-26 Perforation Treatment Performed - Jet Perforation
1999-05-27 Perforation Treatment Performed - Jet Perforation
1999-05-27 Well Began Production
1999-05-27 Well Fluid changed to Gas
1999-05-27 Well Log Performed
1999-05-27 Well Mode changed to Flowing
2000-01-05 Well Fluid changed to Gas
2000-01-05 Well Mode changed to Suspended
2005-06-06 Well Fluid changed to Gas
2005-06-06 Well Mode changed to Flowing
2013-06-01 Well Fluid changed to Gas
2013-06-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-10-12 Perforation 1308.80 1311.20 7
1982-07-26 Cement Squeeze 1290.00 1319.20 0
1999-05-26 Perforation 579.00 583.50 14
1999-05-27 Perforation 543.00 544.00 14
1977-10-14 Acid Treatment 1308.80 1311.20 0
1977-11-24 Acid Treatment 1308.80 1311.20 0
1977-12-28 Perforation 1296.00 1296.60 7
1977-12-28 Perforation 1300.60 1301.20 7
1982-07-18 Acid Treatment 1290.00 1301.20 0
1982-07-22 Acid Treatment 1290.00 1301.20 0
1982-07-24 Perforation 1316.10 1319.20 13
1982-07-24 Acid Treatment 1316.10 1319.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 3620 0.0 0.0 0.0
2000 744 0.0 0.0 0.0
2005 3861 0.0 0.0 0.0
2006 7230 0.0 0.0 0.0
2007 8422 0.0 0.0 0.0
2008 3244 0.0 0.0 0.0
2009 4573 0.0 0.0 0.0
2010 4823 0.0 0.0 0.0

For data sources see[5]

References