If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0565061210000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.826734,"lon":-114.755514,"icon":""}]} |
Location: 00/10-12-056-06W5/0 | |
Location Alias: 00/10-12-56-06 W5M | |
Location Alias 2: 00/10-12-056-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 5 | |
Range: 06 | |
Section: 12 | |
County/Municipality: Lac Ste. Anne County | |
Well Name: EXALTA CHERHILL 10-12-56-6 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0221832 | |
License Date: 1999-03-01 | |
License Status: Suspension | |
Spud Date: 1999-03-06 | |
Final Drill Date: 1999-03-08 | |
Well Total Depth: 715.00 m | |
Surface Hole Latitude: 53.826734 | |
Surface Hole Longitude: -114.755514 |
Date | Event |
---|---|
1999-03-01 | Obtained License |
1999-03-07 | Surface Casing Operation Performed |
1999-03-08 | Finished Drilling |
1999-03-08 | Well Log Performed |
1999-03-09 | Drill Stem Test Performed |
1999-03-10 | Production Casing Operation Performed |
1999-03-10 | Rig Released |
1999-03-10 | Well Mode changed to Drilled and Cased |
1999-03-19 | Perforation Treatment Performed - Jet Perforation |
1999-03-19 | Well Log Performed |
1999-08-25 | Perforation Treatment Performed - Jet Perforation |
1999-08-25 | Well Log Performed |
1999-10-23 | Well Began Production |
1999-10-23 | Well Fluid changed to Gas |
1999-10-23 | Well Mode changed to Flowing |
2000-07-12 | Well Fluid changed to Gas |
2000-07-12 | Well Mode changed to Suspended |
2000-08-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-08-06 | Perforation Treatment Performed - Jet Perforation |
2000-08-06 | Plug Back Performed |
2000-08-06 | Well Fluid changed to Gas |
2000-08-06 | Well Log Performed |
2000-08-06 | Well Mode changed to Abandoned Zone |
2010-10-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-10-28 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-03-19 | Perforation | 618.80 | 619.60 | 20 |
1999-08-25 | Perforation | 644.00 | 645.50 | 13 |
1999-08-25 | Perforation | 613.00 | 614.00 | 13 |
1999-08-25 | Perforation | 610.00 | 611.00 | 13 |
2000-08-06 | Packing Device Capped w/Cement | 597.00 | 605.00 | 0 |
2000-08-06 | Perforation | 182.00 | 182.30 | 14 |
2000-08-06 | Perforation | 182.50 | 183.50 | 14 |
2010-10-28 | Packing Device Capped w/Cement | 172.00 | 180.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 1023 | 0.0 | 0.0 | 0.0 |
2000 | 3025 | 0.0 | 0.0 | 0.0 |
For data sources see[5]