If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0565070501000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.801225,"lon":-115.020847,"icon":""}]} |
Location: 00/01-05-056-07W5/0 | |
Location Alias: 00/01-05-56-07 W5M | |
Location Alias 2: 00/01-05-056-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 5 | |
Range: 07 | |
Section: 05 | |
County/Municipality: Lac Ste. Anne County | |
Well Name: ONLINE PADDLER 1-5-56-7 | |
Operator Name: Point Loma Resources Ltd. | |
License Number: 0444504 | |
License Date: 2012-02-27 | |
License Status: Amended | |
Spud Date: 2012-03-09 | |
Final Drill Date: 2012-03-23 | |
Well Total Depth: 3089.00 m | |
Surface Hole Latitude: 53.801225 | |
Surface Hole Longitude: -115.020847 |
Date | Event |
---|---|
2012-02-27 | Obtained License |
2012-03-10 | Surface Casing Operation Performed |
2012-03-12 | Direction Drilling Operation Performed - Deviate |
2012-03-15 | Direction Drilling Operation Performed - Horizontal |
2012-03-17 | Intermediate Casing Operation Performed |
2012-03-17 | Well Log Performed |
2012-03-23 | Finished Drilling |
2012-03-23 | Well Mode changed to Drilled and Cased |
2012-03-27 | Liner Casing Operation Performed |
2012-03-27 | Rig Released |
2012-07-09 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2012-07-09 | Perforation Treatment Performed - Fractured |
2012-07-10 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2012-07-10 | Perforation Treatment Performed - Fractured |
2012-07-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-16 | Well Fluid changed to Crude Oil |
2012-07-16 | Well Mode changed to Drilling and Completing |
2012-10-15 | Well Began Production |
2012-10-15 | Well Fluid changed to Crude Oil |
2012-10-15 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-03-09 | Ensign Drilling Inc. | 109 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-03-12 | 759.50 | Deviate (5 - 79 degrees) |
2012-03-15 | 1685.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-07-09 | Hydra Jet Perforation | 3065.00 | 3065.10 | 0 |
2012-07-11 | Multi-Stage Fracture | 2675.60 | 2675.70 | 0 |
2012-07-11 | Multi-Stage Fracture | 2589.60 | 2589.70 | 0 |
2012-07-11 | Multi-Stage Fracture | 2530.40 | 2530.50 | 0 |
2012-07-11 | Multi-Stage Fracture | 2471.10 | 2471.20 | 0 |
2012-07-12 | Multi-Stage Fracture | 2397.80 | 2397.90 | 0 |
2012-07-12 | Multi-Stage Fracture | 2283.60 | 2283.70 | 0 |
2012-07-12 | Multi-Stage Fracture | 2097.00 | 2097.10 | 0 |
2012-07-12 | Multi-Stage Fracture | 1882.90 | 1883.00 | 0 |
2012-07-09 | Fracture | 3065.00 | 3065.10 | 0 |
2012-07-09 | Hydra Jet Perforation | 3008.00 | 3008.10 | 0 |
2012-07-09 | Fracture | 3008.00 | 3008.10 | 0 |
2012-07-10 | Multi-Stage Fracture | 2925.00 | 2925.10 | 0 |
2012-07-10 | Hydra Jet Perforation | 2863.50 | 2863.60 | 0 |
2012-07-10 | Fracture | 2863.50 | 2863.60 | 0 |
2012-07-10 | Multi-Stage Fracture | 2793.10 | 2793.20 | 0 |
2012-07-11 | Multi-Stage Fracture | 2734.70 | 2734.80 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1755 | 0.0 | 0.0 | 0.0 |
2013 | 7390 | 0.0 | 0.0 | 0.0 |
2014 | 4995 | 0.0 | 0.0 | 0.0 |
2015 | 668 | 0.0 | 0.0 | 0.0 |
2016 | 2736 | 0.0 | 0.0 | 0.0 |
2017 | 8723 | 0.0 | 0.0 | 0.0 |
2018 | 8457 | 0.0 | 0.0 | 0.0 |
2019 | 4177 | 0.0 | 0.0 | 0.0 |
2020 | 2063 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]