If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0565072706000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.865806,"lon":-114.959912,"icon":""}]} |
Location: 00/06-27-056-07W5/0 | |
Location Alias: 00/06-27-56-07 W5M | |
Location Alias 2: 00/06-27-056-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 5 | |
Range: 07 | |
Section: 27 | |
County/Municipality: Lac Ste. Anne County | |
Well Name: ONE-EX PADDLER 6-27-56-7 | |
Operator Name: Point Loma Resources Ltd. | |
License Number: 0144598 | |
License Date: 1990-06-26 | |
License Status: Suspension | |
Spud Date: 1990-06-29 | |
Final Drill Date: 1990-07-05 | |
Well Total Depth: 1488.00 m | |
Surface Hole Latitude: 53.865806 | |
Surface Hole Longitude: -114.959912 |
Date | Event |
---|---|
1990-06-26 | Obtained License |
1990-06-29 | Well Log Performed |
1990-06-30 | Surface Casing Operation Performed |
1990-07-05 | Finished Drilling |
1990-07-05 | Well Log Performed |
1990-07-06 | Drill Stem Test Performed |
1990-07-07 | Drill Stem Test Performed |
1990-07-08 | Drill Stem Test Performed |
1990-07-09 | Drill Stem Test Performed |
1990-07-11 | Production Casing Operation Performed |
1990-07-11 | Rig Released |
1990-07-11 | Well Mode changed to Drilled and Cased |
1990-10-05 | Well Log Performed |
1990-10-06 | Well Log Performed |
1990-10-07 | Perforation Treatment Performed - Jet Perforation |
1990-10-27 | Perforation Treatment Performed - Acid Wash - No Pressure |
1993-07-27 | Well Began Production |
1993-07-27 | Well Fluid changed to Gas |
1993-07-27 | Well Mode changed to Flowing |
1994-02-26 | Perforation Treatment Performed - Jet Perforation |
1994-03-03 | Well Log Performed |
2011-09-01 | Well Fluid changed to Gas |
2011-09-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-10-07 | Perforation | 1415.00 | 1416.00 | 14 |
1990-10-27 | Acid Wash | 1415.00 | 1416.00 | 0 |
1994-02-26 | Perforation | 1201.50 | 1203.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 3286 | 0.0 | 0.0 | 0.0 |
1994 | 7717 | 0.0 | 0.0 | 0.0 |
1995 | 7833 | 0.0 | 0.0 | 0.0 |
1996 | 8278 | 0.0 | 0.0 | 0.0 |
1997 | 8120 | 0.0 | 0.0 | 0.0 |
1998 | 7121 | 0.0 | 0.0 | 0.0 |
1999 | 8382 | 0.0 | 0.0 | 0.0 |
2000 | 8116 | 0.0 | 0.0 | 0.0 |
2001 | 7521 | 0.0 | 0.0 | 0.0 |
2002 | 8312 | 0.0 | 0.0 | 0.0 |
2003 | 8604 | 0.0 | 0.0 | 0.0 |
2004 | 8134 | 0.0 | 0.0 | 0.0 |
2005 | 7695 | 0.0 | 0.0 | 0.0 |
2006 | 8327 | 0.0 | 0.0 | 0.0 |
2007 | 8557 | 0.0 | 0.0 | 0.0 |
2008 | 1205 | 0.0 | 0.0 | 0.0 |
2010 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]