X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565082004002

Well Details

Well ID: 0565082004002
Loading map...
Location: 00/04-20-056-08W5/2
Location Alias: 00/04-20-56-08 W5M
Location Alias 2: 00/04-20-056-08 W5/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 08
Section: 20
County/Municipality: Lac Ste. Anne County
Well Name: FMEL PADDLER 4-20-56-8
Operator Name: Point Loma Resources Ltd.
License Number: 0032898
License Date: 1967-10-12
License Status: Suspension
Spud Date: 1967-10-22
Final Drill Date: 1967-10-30
Well Total Depth: 1610.90 m
Surface Hole Latitude: 53.847889
Surface Hole Longitude: -115.163829

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-10-12 Obtained License
1967-10-30 Finished Drilling
1967-10-30 Well Mode changed to Drilled and Cased
1967-11-01 Drill Stem Test Performed
1967-11-02 Production Casing Operation Performed
1967-11-22 Perforation Treatment Performed - Jet Perforation
1967-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-03-11 Perforation Treatment Performed - Jet Perforation
1976-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-07-13 Well Began Production
1976-07-13 Well Fluid changed to Gas
1976-07-13 Well Mode changed to Flowing
1989-05-18 Perforation Treatment Performed - Chemical Squeeze
1996-11-07 Well Fluid changed to Gas
1996-11-07 Well Mode changed to Suspended
2007-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-28 Plug Back Performed
2007-10-28 Well Fluid changed to Gas
2007-10-28 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-11-22 Perforation 1571.90 1572.80 7
2007-10-28 Packing Device Capped w/Cement 1533.70 1541.70 0
1967-11-22 Perforation 1573.70 1574.60 7
1967-11-25 Acid Treatment 1571.90 1574.60 0
1976-03-10 Packing Device Capped w/Cement 1561.50 1564.50 0
1976-03-11 Perforation 1548.70 1549.90 7
1976-03-11 Perforation 1551.40 1557.50 7
1976-03-12 Acid Treatment 1548.70 1557.50 0
1989-05-18 Chemical Squeeze 1548.70 1557.50 0
2007-10-28 Packing Device Capped w/Cement 1553.00 1561.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2425 0.0 0.0 0.0
1977 4991 0.0 0.0 0.0
1978 8317 0.0 0.0 0.0
1979 8296 0.0 0.0 0.0
1980 8413 0.0 0.0 0.0
1981 8456 0.0 0.0 0.0
1982 7381 0.0 0.0 0.0
1983 5540 0.0 0.0 0.0
1984 8196 0.0 0.0 0.0
1985 5195 0.0 0.0 0.0
1986 5882 0.0 0.0 0.0
1987 8304 0.0 0.0 0.0
1988 8574 0.0 0.0 0.0
1989 6471 0.0 0.0 0.0
1990 5972 0.0 0.0 0.0
1991 7592 0.0 0.0 0.0
1992 2775 0.0 0.0 0.0
1993 8629 0.0 0.0 0.0
1994 6296 0.0 0.0 0.0
1995 2808 0.0 0.0 0.0
1996 1026 0.0 0.0 0.0

For data sources see[5]

References