X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565082006020

Well Details

Well ID: 0565082006020
Loading map...
Location: 02/06-20-056-08W5/0
Location Alias: 02/06-20-56-08 W5M
Location Alias 2: 02/06-20-056-08 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 08
Section: 20
County/Municipality: Lac Ste. Anne County
Well Name: PADRIV DEV PADDLER 6-20-56-8
Operator Name: Padriv Development Ltd.
License Number: 0175774
License Date: 1995-02-07
License Status: Abandoned
Spud Date: 1995-03-15
Final Drill Date: 1995-03-21
Well Total Depth: 1580.00 m
Surface Hole Latitude: 53.851751
Surface Hole Longitude: -115.157290

For data sources see[1][2]

Well History

Date Event
1995-02-07 Obtained License
1995-03-15 Surface Casing Operation Performed
1995-03-21 Finished Drilling
1995-03-21 Well Log Performed
1995-03-21 Well Mode changed to Drilled and Cased
1995-03-23 Production Casing Operation Performed
1995-03-23 Rig Released
1995-05-20 Perforation Treatment Performed - Jet Perforation
1995-05-20 Well Log Performed
1995-05-21 Perforation Treatment Performed - Jet Perforation
1995-05-21 Well Log Performed
1995-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-05-31 Perforation Treatment Performed - Cement Squeeze
1995-05-31 Plug Back Performed
1995-06-03 Perforation Treatment Performed - Jet Perforation
1995-06-27 Well Began Production
1995-06-27 Well Fluid changed to Crude Oil
1995-06-27 Well Mode changed to Pumping
1998-05-01 Well Fluid changed to Crude Oil
1998-05-01 Well Mode changed to Suspended
2000-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-27 Plug Back Performed
2000-01-27 Well Log Performed
2000-01-28 Well Abandoned
2000-01-28 Well Fluid changed to Crude Oil
2000-01-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-05-20 Perforation 1557.00 1561.00 13
1995-05-21 Perforation 1548.00 1552.00 13
1995-05-22 Acid Treatment 1548.00 1552.00 0
1995-05-31 Cement Squeeze 1548.00 1552.00 0
1995-06-03 Perforation 1547.50 1548.50 13
2000-01-27 Packing Device Capped w/Cement 1527.00 1537.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 2721 0.0 0.0 0.0
1996 1412 0.0 0.0 0.0

For data sources see[5]

References