If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0565231915000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.857534,"lon":-117.40658,"icon":""}]} |
| Location: 00/15-19-056-23W5/0 | |
| Location Alias: 00/15-19-56-23 W5M | |
| Location Alias 2: 00/15-19-056-23 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 056 | |
| Meridian: 5 | |
| Range: 23 | |
| Section: 19 | |
| County/Municipality: Yellowhead County | |
| Well Name: TALISMAN ET AL WILDR 15-19-56-23 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0144874 | |
| License Date: 1990-07-20 | |
| License Status: Issued | |
| Spud Date: 1990-07-27 | |
| Final Drill Date: 1990-11-10 | |
| Well Total Depth: 4194.00 m | |
| Surface Hole Latitude: 53.857534 | |
| Surface Hole Longitude: -117.406580 |
| Date | Event |
|---|---|
| 1990-07-20 | Obtained License |
| 1990-07-31 | Surface Casing Operation Performed |
| 1990-09-06 | Well Log Performed |
| 1990-09-08 | Intermediate Casing Operation Performed |
| 1990-09-08 | Lost Circulation Occurred |
| 1990-09-28 | Well Log Performed |
| 1990-10-22 | Well Log Performed |
| 1990-10-23 | Well Log Performed |
| 1990-10-25 | Intermediate Casing Operation Performed |
| 1990-10-25 | Lost Circulation Occurred |
| 1990-11-10 | Finished Drilling |
| 1990-11-10 | Well Log Performed |
| 1990-11-10 | Well Mode changed to Drilled and Cased |
| 1990-11-11 | Well Log Performed |
| 1990-11-12 | Well Log Performed |
| 1990-11-13 | Well Log Performed |
| 1990-11-15 | Well Log Performed |
| 1990-11-19 | Liner Casing Operation Performed |
| 1990-11-25 | Rig Released |
| 1990-11-25 | Well Log Performed |
| 1991-03-09 | Perforation Treatment Performed - Jet Perforation |
| 1991-03-09 | Well Log Performed |
| 1991-03-10 | Perforation Treatment Performed - Jet Perforation |
| 1991-03-11 | Perforation Treatment Performed - Jet Perforation |
| 1991-03-12 | Perforation Treatment Performed - Jet Perforation |
| 1991-03-13 | Perforation Treatment Performed - Jet Perforation |
| 1991-03-14 | Perforation Treatment Performed - Jet Perforation |
| 1991-03-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1992-09-21 | Well Began Production |
| 1992-09-21 | Well Fluid changed to Gas |
| 1992-09-21 | Well Mode changed to Flowing |
| 1998-10-15 | Perforation Treatment Performed - Jet Perforation |
| 1998-10-16 | Perforation Treatment Performed - Jet Perforation |
| 1998-10-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2007-01-01 | Well Fluid changed to Gas |
| 2007-01-01 | Well Mode changed to Pumping |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1991-03-09 | Perforation | 4152.00 | 4154.00 | 3 |
| 1991-03-14 | Perforation | 4065.00 | 4071.70 | 3 |
| 1991-03-14 | Perforation | 4072.00 | 4078.80 | 3 |
| 1991-03-17 | Acid Treatment | 4065.00 | 4163.00 | 0 |
| 1998-10-15 | Perforation | 4114.00 | 4123.00 | 13 |
| 1998-10-15 | Perforation | 4126.50 | 4131.00 | 13 |
| 1998-10-16 | Perforation | 4077.50 | 4082.00 | 13 |
| 1998-10-16 | Perforation | 4113.90 | 4118.50 | 13 |
| 1998-10-19 | Acid Treatment | 4065.00 | 4131.00 | 0 |
| 1991-03-09 | Perforation | 4159.00 | 4163.00 | 3 |
| 1991-03-10 | Perforation | 4122.90 | 4130.00 | 7 |
| 1991-03-11 | Perforation | 4115.80 | 4122.70 | 7 |
| 1991-03-12 | Perforation | 4101.40 | 4108.20 | 7 |
| 1991-03-12 | Perforation | 4108.40 | 4115.60 | 7 |
| 1991-03-13 | Perforation | 4079.10 | 4085.90 | 3 |
| 1991-03-13 | Perforation | 4086.20 | 4093.00 | 3 |
| 1991-03-13 | Perforation | 4095.00 | 4101.40 | 3 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1991 | 252 | 0.0 | 0.0 | 0.0 |
| 1992 | 2120 | 0.0 | 0.0 | 0.0 |
| 1993 | 8585 | 0.0 | 0.0 | 0.0 |
| 1994 | 8637 | 0.0 | 0.0 | 0.0 |
| 1995 | 8717 | 0.0 | 0.0 | 0.0 |
| 1996 | 8778 | 0.0 | 0.0 | 0.0 |
| 1997 | 8636 | 0.0 | 0.0 | 0.0 |
| 1998 | 8227 | 0.0 | 0.0 | 0.0 |
| 1999 | 8367 | 0.0 | 0.0 | 0.0 |
| 2000 | 8426 | 0.0 | 0.0 | 0.0 |
| 2001 | 8387 | 0.0 | 0.0 | 0.0 |
| 2002 | 8311 | 0.0 | 0.0 | 0.0 |
| 2003 | 8584 | 0.0 | 0.0 | 0.0 |
| 2004 | 8783 | 0.0 | 0.0 | 0.0 |
| 2005 | 8759 | 0.0 | 0.0 | 0.0 |
| 2006 | 8674 | 0.0 | 0.0 | 0.0 |
| 2007 | 8677 | 0.0 | 0.0 | 0.0 |
| 2008 | 8745 | 0.0 | 0.0 | 0.0 |
| 2009 | 8752 | 0.0 | 0.0 | 0.0 |
| 2010 | 8687 | 0.0 | 0.0 | 0.0 |
| 2011 | 8735 | 0.0 | 0.0 | 0.0 |
| 2012 | 8714 | 0.0 | 0.0 | 0.0 |
| 2013 | 7673 | 0.0 | 0.0 | 0.0 |
| 2014 | 8703 | 0.0 | 0.0 | 0.0 |
| 2015 | 8673 | 0.0 | 0.0 | 0.0 |
| 2016 | 6036 | 0.0 | 0.0 | 0.0 |
| 2017 | 8137 | 0.0 | 0.0 | 0.0 |
| 2018 | 8177 | 0.0 | 0.0 | 0.0 |
| 2019 | 6508 | 0.0 | 0.0 | 0.0 |
| 2020 | 2111 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1990-09-08 | Lost Circulation | 2709.00 | 2709.00 |
| 1990-10-25 | Lost Circulation | 3947.00 | 3947.00 |
For data sources see[6]