X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574010212030

Well Details

Well ID: 0574010212030
Loading map...
Location: 03/12-02-057-01W4/0
Location Alias: 03/12-02-57-01 W4M
Location Alias 2: 03/12-02-057-01 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 01
Section: 02
County/Municipality: Fishing Lake Metis Settlement
Well Name: CNRL 12B FROG LK 12-2-57-1
Operator Name: Canadian Natural Resources Limited
License Number: 0433807
License Date: 2011-05-27
License Status: Abandoned
Spud Date: 2011-08-13
Final Drill Date: 2011-08-14
Well Total Depth: 775.00 m
Surface Hole Latitude: 53.900092
Surface Hole Longitude: -110.048529

For data sources see[1][2]

Well History

Date Event
2011-05-27 Obtained License
2011-08-13 Direction Drilling Operation Performed - Deviate
2011-08-13 Surface Casing Operation Performed
2011-08-14 Finished Drilling
2011-08-14 Well Mode changed to Drilled and Cased
2011-08-15 Production Casing Operation Performed
2011-08-15 Rig Released
2011-08-15 Well Log Performed
2011-09-04 Perforation Treatment Performed - Jet Perforation
2011-09-12 Well Began Production
2011-09-12 Well Fluid changed to Crude Bitumen
2011-09-12 Well Mode changed to Pumping
2013-07-10 Perforation Treatment Performed - Cement Plug
2013-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-07-11 Plug Back Performed
2013-07-11 Well Fluid changed to Crude Bitumen
2013-07-11 Well Mode changed to Abandoned Zone
2013-07-12 Perforation Treatment Performed - Jet Perforation
2017-06-26 Well Log Performed
2017-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-08-10 Plug Back Performed
2018-01-15 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-13 4.50 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-04 Perforation 744.00 746.50 26
2011-09-04 Perforation 747.00 750.00 26
2013-07-10 Cement Plug 750.00 765.00 0
2013-07-11 Packing Device Capped w/Cement 725.00 740.00 0
2013-07-12 Perforation 627.50 631.00 26
2017-08-10 Packing Device Capped w/Cement 609.70 620.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1013 0.0 0.0 0.0
2012 7551 0.0 0.0 0.0
2013 2513 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-07-14 No Incident Encountered 0.00 0.00
2017-08-10 No Incident Encountered 0.00 0.00

For data sources see[7]

References