X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574010415000

Well Details

Well ID: 0574010415000
Loading map...
Location: 00/15-04-057-01W4/0
Location Alias: 00/15-04-57-01 W4M
Location Alias 2: 00/15-04-057-01 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 01
Section: 04
County/Municipality: Fishing Lake Metis Settlement
Well Name: CNRES 15B FROG LAKE 15-4-57-1
Operator Name: Canadian Natural Resources Limited
License Number: 0224323
License Date: 1999-07-09
License Status: Issued
Spud Date: 1999-08-04
Final Drill Date: 1999-08-29
Well Total Depth: 782.00 m
Surface Hole Latitude: 53.905013
Surface Hole Longitude: -110.089818

For data sources see[1][2]

Well History

Date Event
1999-07-09 Obtained License
1999-08-04 Direction Drilling Operation Performed - Deviate
1999-08-04 Surface Casing Operation Performed
1999-08-29 Finished Drilling
1999-08-29 Well Log Performed
1999-08-30 Production Casing Operation Performed
1999-08-30 Rig Released
1999-08-30 Well Mode changed to Drilled and Cased
1999-09-10 Well Log Performed
1999-09-11 Perforation Treatment Performed - Jet Perforation
1999-10-01 Well Began Production
1999-10-01 Well Fluid changed to Crude Bitumen
1999-10-01 Well Mode changed to Pumping
1999-10-02 Well Log Performed
2003-02-21 Perforation Treatment Performed - Cement Plug
2003-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-22 Plug Back Performed
2003-02-22 Well Fluid changed to Crude Bitumen
2003-02-22 Well Mode changed to Abandoned Zone
2003-02-23 Perforation Treatment Performed - Jet Perforation
2007-03-02 Perforation Treatment Performed - Cement Plug
2007-03-03 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-08-04 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-09-11 Perforation 658.00 659.00 39
2003-02-21 Cement Plug 659.00 773.00 0
2003-02-22 Packing Device Capped w/Cement 646.00 654.00 0
2003-02-23 Perforation 628.00 633.00 26
2007-03-02 Cement Plug 633.00 646.00 0
2007-03-03 Perforation 616.50 622.00 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 1650 0.0 0.0 0.0
2000 7580 0.0 0.0 0.0
2001 4980 0.0 0.0 0.0
2002 744 0.0 0.0 0.0

For data sources see[6]

References