X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574010603002

Well Details

Well ID: 0574010603002
Loading map...
Location: 00/03-06-057-01W4/2
Location Alias: 00/03-06-57-01 W4M
Location Alias 2: 00/03-06-057-01 W4/02
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 01
Section: 06
County/Municipality: Fishing Lake Metis Settlement
Well Name: CNRL JOHN LAKE 3-6-57-1
Operator Name: Canadian Natural Resources Limited
License Number: 0194265
License Date: 1996-11-28
License Status: Abandoned
Spud Date: 1997-01-01
Final Drill Date: 1997-01-04
Well Total Depth: 611.00 m
Surface Hole Latitude: 53.892335
Surface Hole Longitude: -110.143173

For data sources see[1][2]

Well History

Date Event
1996-01-04 Well Log Performed
1996-11-28 Obtained License
1997-01-02 Surface Casing Operation Performed
1997-01-04 Finished Drilling
1997-01-04 Well Log Performed
1997-01-04 Well Mode changed to Drilled and Cased
1997-01-05 Production Casing Operation Performed
1997-01-05 Rig Released
1997-01-22 Perforation Treatment Performed - Jet Perforation
1997-01-22 Well Log Performed
1998-02-21 Well Began Production
1998-02-21 Well Fluid changed to Crude Bitumen
1998-02-21 Well Log Performed
1998-02-21 Well Mode changed to Pumping
1998-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-02-22 Perforation Treatment Performed - Jet Perforation
1998-02-22 Plug Back Performed
1998-02-22 Well Log Performed
1999-09-30 Perforation Treatment Performed - Jet Perforation
1999-09-30 Well Log Performed
2000-03-28 Perforation Treatment Performed - Casing Patch (Over Perfs)
2000-03-29 Perforation Treatment Performed - Jet Perforation
2000-03-29 Well Log Performed
2000-03-30 Well Fluid changed to Crude Bitumen
2000-03-30 Well Mode changed to Suspended
2000-03-31 Well Fluid changed to Crude Bitumen
2000-03-31 Well Mode changed to Suspended
2007-09-08 Perforation Treatment Performed - Jet Perforation
2007-09-09 Perforation Treatment Performed - Cement Plug
2007-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-09-10 Plug Back Performed
2007-09-10 Well Fluid changed to Crude Bitumen
2007-09-10 Well Mode changed to Abandoned Zone
2007-09-11 Perforation Treatment Performed - Cement Plug
2007-09-11 Plug Back Performed
2007-09-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-01-22 Perforation 502.50 504.50 26
2007-09-10 Packing Device Capped w/Cement 458.00 466.00 0
2007-09-11 Cement Plug 443.00 458.00 0
1998-02-22 Packing Device Capped w/Cement 497.00 498.00 0
1998-02-22 Perforation 459.50 462.00 39
1999-09-30 Perforation 480.50 482.50 39
2000-03-28 Casing Patch 459.50 462.00 0
2000-03-29 Perforation 471.00 476.00 26
2007-09-08 Perforation 502.50 504.50 26
2007-09-09 Cement Plug 561.00 601.00 0
2007-09-10 Packing Device Capped w/Cement 479.00 490.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 384 0.0 0.0 0.0
1999 3044 0.0 0.0 0.0
2000 1074 0.0 0.0 0.0

For data sources see[5]

References