X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574030512040

Well Details

Well ID: 0574030512040
Loading map...
Location: 04/12-05-057-03W4/0
Location Alias: 04/12-05-57-03 W4M
Location Alias 2: 04/12-05-057-03 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 03
Section: 05
County/Municipality: Unipouheos 121
Well Name: WLEC 12B FROG LK 12-5-57-3
Operator Name: West Lake Energy Corp.
License Number: 0442098
License Date: 2011-12-29
License Status: Suspension
Spud Date: 2012-03-13
Final Drill Date: 2012-03-14
Well Total Depth: 602.00 m
Surface Hole Latitude: 53.899817
Surface Hole Longitude: -110.425505

For data sources see[1][2]

Well History

Date Event
2011-12-29 Obtained License
2012-03-13 Direction Drilling Operation Performed - Deviate
2012-03-13 Surface Casing Operation Performed
2012-03-14 Finished Drilling
2012-03-14 Production Casing Operation Performed
2012-03-14 Well Log Performed
2012-03-14 Well Mode changed to Drilled and Cased
2012-03-15 Rig Released
2012-04-05 Perforation Treatment Performed - Cement Plug
2012-04-05 Well Log Performed
2012-04-09 Perforation Treatment Performed - Jet Perforation
2012-04-12 Well Began Production
2012-04-12 Well Fluid changed to Crude Bitumen
2012-04-12 Well Mode changed to Pumping
2018-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-10-02 Plug Back Performed
2018-10-02 Well Fluid changed to Crude Bitumen
2018-10-02 Well Mode changed to Abandoned Zone
2018-10-03 Perforation Treatment Performed - Jet Perforation
2018-10-03 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-03-13 Savanna Drilling Corp. 430 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-03-13 120.00 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-04-05 Cement Plug 590.00 593.00 0
2012-04-09 Perforation 548.50 551.00 26
2018-10-02 Packing Device Capped w/Cement 538.00 546.00 0
2018-10-03 Perforation 522.50 527.00 26

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6504 0.0 0.0 0.0
2013 8707 0.0 0.0 0.0
2014 8567 0.0 0.0 0.0
2015 8712 0.0 0.0 0.0
2016 8694 0.0 0.0 0.0
2017 384 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-05 No Incident Encountered 0.00 0.00
2018-10-02 No Incident Encountered 0.00 0.00
2018-10-03 No Incident Encountered 0.00 0.00

For data sources see[8]

References