X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574052310000

Well Details

Well ID: 0574052310000
Loading map...
Location: 00/10-23-057-05W4/0
Location Alias: 00/10-23-57-05 W4M
Location Alias 2: 00/10-23-057-05 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 05
Section: 23
County/Municipality: County of St. Paul No. 19
Well Name: CNRL 10A LINDBERGH 10-23-57-5
Operator Name: Canadian Natural Resources Limited
License Number: 0193237
License Date: 1996-11-07
License Status: Abandoned
Spud Date: 1996-12-04
Final Drill Date: 1996-12-05
Well Total Depth: 633.00 m
Surface Hole Latitude: 53.944177
Surface Hole Longitude: -110.630349

For data sources see[1][2]

Well History

Date Event
1996-11-07 Obtained License
1996-12-04 Conductor Casing Operation Performed
1996-12-04 Direction Drilling Operation Performed - Deviate
1996-12-05 Finished Drilling
1996-12-05 Well Log Performed
1996-12-05 Well Mode changed to Drilled and Cased
1996-12-06 Production Casing Operation Performed
1996-12-06 Rig Released
1996-12-06 Well Log Performed
1997-03-23 Perforation Treatment Performed - Jet Perforation
1997-04-01 Well Began Production
1997-04-01 Well Fluid changed to Crude Bitumen
1997-04-01 Well Mode changed to Pumping
1998-06-01 Well Fluid changed to Crude Bitumen
1998-06-01 Well Mode changed to Suspended
2000-03-19 Well Fluid changed to Crude Bitumen
2000-03-19 Well Mode changed to Pumping
2000-10-23 Perforation Treatment Performed - Jet Perforation
2000-10-23 Well Fluid changed to Crude Bitumen
2000-10-23 Well Log Performed
2000-10-23 Well Mode changed to Pumping
2003-03-31 Well Fluid changed to Crude Bitumen
2003-03-31 Well Mode changed to Suspended
2003-04-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-04-23 Well Fluid changed to Crude Bitumen
2003-04-23 Well Mode changed to Abandoned Zone
2003-04-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-04-24 Perforation Treatment Performed - Jet Perforation
2003-04-24 Plug Back Performed
2014-10-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-10-24 Plug Back Performed
2016-10-13 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-12-04 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-03-23 Perforation 600.30 604.30 39
2000-10-23 Perforation 578.30 580.00 26
2003-04-23 Packing Device Capped w/Cement 578.00 597.50 0
2003-04-24 Packing Device Capped w/Cement 568.00 576.00 0
2003-04-24 Perforation 539.50 541.00 26
2003-04-24 Perforation 543.00 544.00 26
2014-10-24 Packing Device Capped w/Cement 510.00 530.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 6195 0.0 0.0 0.0
1998 1288 0.0 0.0 0.0
2000 2470 0.0 0.0 0.0
2001 7910 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-24 No Incident Encountered 0.00 0.00

For data sources see[7]

References