X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574061002002

Well Details

Well ID: 0574061002002
Loading map...
Location: 00/02-10-057-06W4/2
Location Alias: 00/02-10-57-06 W4M
Location Alias 2: 00/02-10-057-06 W4/02
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 06
Section: 10
County/Municipality: County of St. Paul No. 19
Well Name: ANADARKO 2C LINDBERGH 2-10-57-6
Operator Name: Canadian Natural Resources Limited
License Number: 0251429
License Date: 2001-02-16
License Status: Suspension
Spud Date: 2001-04-08
Final Drill Date: 2001-04-09
Well Total Depth: 570.00 m
Surface Hole Latitude: 53.906421
Surface Hole Longitude: -110.807834

For data sources see[1][2]

Well History

Date Event
2001-02-16 Obtained License
2001-04-08 Surface Casing Operation Performed
2001-04-09 Finished Drilling
2001-04-09 Well Mode changed to Drilled and Cased
2001-04-10 Production Casing Operation Performed
2001-04-10 Rig Released
2001-04-10 Well Log Performed
2001-04-20 Perforation Treatment Performed - Jet Perforation
2001-04-20 Well Log Performed
2003-05-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-05-11 Plug Back Performed
2003-05-12 Perforation Treatment Performed - Jet Perforation
2003-05-12 Well Began Production
2003-05-12 Well Fluid changed to Crude Bitumen
2003-05-12 Well Log Performed
2003-05-12 Well Mode changed to Pumping
2006-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-21 Plug Back Performed
2006-02-21 Well Fluid changed to Crude Bitumen
2006-02-21 Well Mode changed to Abandoned Zone
2006-02-27 Perforation Treatment Performed - Jet Perforation
2011-10-19 Perforation Treatment Performed - Casing Patch (Over Perfs)
2011-10-20 Perforation Treatment Performed - Jet Perforation
2011-10-21 Perforation Treatment Performed - Casing Patch (Over Perfs)
2011-10-22 Perforation Treatment Performed - Jet Perforation
2011-10-24 Perforation Treatment Performed - Remedial Casing
2011-10-27 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-04-20 Perforation 542.50 546.00 26
2011-10-20 Perforation 397.00 398.00 26
2011-10-20 Perforation 400.00 401.00 26
2011-10-20 Perforation 542.50 546.00 26
2011-10-21 Casing Patch 397.00 401.00 0
2011-10-22 Perforation 526.80 527.80 17
2011-10-22 Perforation 520.00 521.00 17
2011-10-24 Remedial Casing Cementing 520.00 527.80 0
2011-10-27 Perforation 536.50 537.50 13
2011-10-27 Perforation 542.50 546.00 13
2001-04-20 Perforation 536.50 537.50 26
2003-05-11 Packing Device Capped w/Cement 519.00 534.00 0
2003-05-12 Perforation 397.00 398.00 26
2003-05-12 Perforation 400.00 401.00 26
2006-02-21 Packing Device Capped w/Cement 379.00 390.00 0
2006-02-27 Perforation 354.50 356.00 17
2011-10-19 Casing Patch 354.50 356.00 0
2011-10-20 Perforation 536.50 537.50 26

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 836 0.0 0.0 0.0

For data sources see[5]

References