X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574212005000

Well Details

Well ID: 0574212005000
Loading map...
Location: 00/05-20-057-21W4/0
Location Alias: 00/05-20-57-21 W4M
Location Alias 2: 00/05-20-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 20
County/Municipality: Redwater
Well Name: ACCEL HOLDINGS REDWATER 5-20-57-21
Operator Name: ACCEL Canada Holdings Limited
License Number: 0000661
License Date: 1949-09-28
License Status: Issued
Spud Date: 1949-10-12
Final Drill Date: 1949-10-27
Well Total Depth: 1003.70 m
Surface Hole Latitude: 53.939883
Surface Hole Longitude: -113.096495

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-09-28 Obtained License
1949-10-24 Production Casing Operation Performed
1949-10-27 Finished Drilling
1949-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-10-27 Perforation Treatment Performed - Open-Hole Completion
1949-10-27 Well Mode changed to Drilled and Cased
1949-10-28 Well Began Production
1949-10-28 Well Fluid changed to Crude Oil
1949-10-28 Well Mode changed to Flowing
1950-08-07 Well Fluid changed to Crude Oil
1950-08-07 Well Mode changed to Pumping
1971-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-29 Well Log Performed
1988-08-30 Perforation Treatment Performed - Jet Perforation
1988-08-30 Well Log Performed
1988-08-31 Well Log Performed
1988-09-01 Perforation Treatment Performed - Cement Plug
1988-09-01 Perforation Treatment Performed - Open-Hole Completion
1988-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-06 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-10-27 Open Hole/Barefoot Completion 977.20 1003.70 0
1949-10-27 Acid Treatment 977.20 1003.70 0
1971-09-22 Acid Treatment 991.20 1003.40 0
1988-08-30 Perforation 985.40 991.20 13
1988-09-01 Cement Plug 997.30 1003.70 0
1988-09-01 Open Hole/Barefoot Completion 977.20 997.30 0
1988-09-02 Acid Treatment 977.20 997.30 0
1988-09-06 Perforation 990.90 996.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1972 6524 0.0 0.0 0.0
1973 6613 0.0 0.0 0.0
1974 8249 0.0 0.0 0.0
1975 8394 0.0 0.0 0.0
1976 8286 0.0 0.0 0.0
1977 8132 0.0 0.0 0.0
1978 8173 0.0 0.0 0.0
1979 8291 0.0 0.0 0.0
1980 8211 0.0 0.0 0.0
1981 8485 0.0 0.0 0.0
1982 8325 0.0 0.0 0.0
1983 8691 0.0 0.0 0.0
1984 8567 0.0 0.0 0.0
1985 8711 0.0 0.0 0.0
1986 8615 0.0 0.0 0.0
1987 8729 0.0 0.0 0.0
1988 6996 0.0 0.0 0.0
1989 2943 0.0 0.0 0.0
1990 8439 0.0 0.0 0.0
1991 8724 0.0 0.0 0.0
1992 8055 0.0 0.0 0.0
1993 8722 0.0 0.0 0.0
1994 8418 0.0 0.0 0.0
1995 8731 0.0 0.0 0.0
1996 8758 0.0 0.0 0.0
1997 8297 0.0 0.0 0.0
1998 8569 0.0 0.0 0.0
1999 7702 0.0 0.0 0.0
2000 6831 0.0 0.0 0.0
2001 8339 0.0 0.0 0.0
2002 8336 0.0 0.0 0.0
2003 8747 0.0 0.0 0.0
2004 8654 0.0 0.0 0.0
2005 8757 0.0 0.0 0.0
2006 7032 0.0 0.0 0.0
2007 8667 0.0 0.0 0.0
2008 8176 0.0 0.0 0.0
2009 8654 0.0 0.0 0.0
2010 8496 0.0 0.0 0.0
2011 8587 0.0 0.0 0.0
2012 8677 0.0 0.0 0.0
2013 7935 0.0 0.0 0.0
2014 8242 0.0 0.0 0.0
2015 8164 0.0 0.0 0.0
2016 7865 0.0 0.0 0.0
2017 8717 0.0 0.0 0.0
2018 7823 0.0 0.0 0.0
2019 3401 0.0 0.0 0.0

For data sources see[5]

References