X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574212007000

Well Details

Well ID: 0574212007000
Loading map...
Location: 00/07-20-057-21W4/0
Location Alias: 00/07-20-57-21 W4M
Location Alias 2: 00/07-20-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 20
County/Municipality: Redwater
Well Name: ACCEL HOLDINGS REDWATER 7-20-57-21
Operator Name: ACCEL Canada Holdings Limited
License Number: 0000882
License Date: 1949-11-14
License Status: Abandoned
Spud Date: 1949-11-26
Final Drill Date: 1949-12-06
Well Total Depth: 1002.50 m
Surface Hole Latitude: 53.939878
Surface Hole Longitude: -113.084329

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-11-14 Obtained License
1949-12-04 Production Casing Operation Performed
1949-12-06 Finished Drilling
1949-12-06 Perforation Treatment Performed - Open-Hole Completion
1949-12-06 Well Mode changed to Drilled and Cased
1949-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-12-12 Well Began Production
1949-12-12 Well Fluid changed to Crude Oil
1949-12-12 Well Mode changed to Flowing
1950-08-16 Well Fluid changed to Crude Oil
1950-08-16 Well Mode changed to Pumping
1971-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-01-01 Well Fluid changed to Crude Oil
1975-01-01 Well Mode changed to Suspended
1985-04-16 Well Log Performed
1985-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-07-10 Plug Back Performed
1985-07-10 Well Fluid changed to Crude Oil
1985-07-10 Well Log Performed
1985-07-10 Well Mode changed to Abandoned Zone
1985-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-11 Perforation Treatment Performed - Jet Perforation
1985-07-11 Well Log Performed
1985-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-07-15 Perforation Treatment Performed - Jet Perforation
1985-07-15 Plug Back Performed
1985-07-15 Well Log Performed
1985-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-19 Plug Back Performed
1996-05-13 Perforation Treatment Performed - Jet Perforation
1996-05-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-22 Perforation Treatment Performed - Remedial Casing
1996-06-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-12-06 Open Hole/Barefoot Completion 974.40 1002.50 0
1985-07-16 Acid Treatment 636.00 637.50 0
1996-03-19 Packing Device Capped w/Cement 620.50 628.50 0
1996-05-13 Perforation 216.00 217.00 13
1996-05-22 Remedial Casing Cementing 216.00 217.00 0
1996-05-22 Packing Device Capped w/Cement 168.00 218.00 0
1949-12-07 Acid Treatment 974.40 1002.50 0
1971-09-24 Acid Treatment 974.40 986.30 0
1974-05-29 Acid Treatment 974.40 1002.50 0
1985-07-10 Packing Device Capped w/Cement 962.00 970.00 0
1985-07-11 Perforation 662.50 665.50 13
1985-07-11 Acid Treatment 662.50 665.50 0
1985-07-15 Packing Device Capped w/Cement 650.00 658.00 0
1985-07-15 Perforation 636.00 637.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1972 6289 0.0 0.0 0.0
1973 8105 0.0 0.0 0.0
1974 4714 0.0 0.0 0.0

For data sources see[5]

References