X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574212015000

Well Details

Well ID: 0574212015000
Loading map...
Location: 00/15-20-057-21W4/0
Location Alias: 00/15-20-57-21 W4M
Location Alias 2: 00/15-20-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 20
County/Municipality: Redwater
Well Name: ACCEL HOLDINGS REDWATER 15-20-57-21
Operator Name: ACCEL Canada Holdings Limited
License Number: 0001079
License Date: 1949-12-29
License Status: Suspension
Spud Date: 1950-01-04
Final Drill Date: 1950-01-16
Well Total Depth: 998.80 m
Surface Hole Latitude: 53.946593
Surface Hole Longitude: -113.083473

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-12-29 Obtained License
1950-01-13 Production Casing Operation Performed
1950-01-16 Finished Drilling
1950-01-16 Perforation Treatment Performed - Open-Hole Completion
1950-01-16 Well Mode changed to Drilled and Cased
1950-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-01-23 Well Began Production
1950-01-23 Well Fluid changed to Crude Oil
1950-01-23 Well Mode changed to Flowing
1950-08-29 Well Fluid changed to Crude Oil
1950-08-29 Well Mode changed to Pumping
1988-02-12 Well Log Performed
2005-12-01 Well Fluid changed to Crude Oil
2005-12-01 Well Mode changed to Suspended
2006-03-19 Well Log Performed
2006-05-18 Well Fluid changed to Crude Oil
2006-05-18 Well Mode changed to Pumping
2015-03-05 Well Fluid changed to Crude Oil
2015-03-05 Well Mode changed to Suspended
2015-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-03-16 Plug Back Performed
2015-03-16 Well Fluid changed to Crude Oil
2015-03-16 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-01-16 Open Hole/Barefoot Completion 958.60 998.80 0
1950-01-17 Acid Treatment 958.60 998.80 0
2015-03-16 Packing Device Capped w/Cement 807.40 953.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5932 0.0 0.0 0.0
1968 5548 0.0 0.0 0.0
1969 5646 0.0 0.0 0.0
1970 5926 0.0 0.0 0.0
1971 6479 0.0 0.0 0.0
1972 6814 0.0 0.0 0.0
1973 7535 0.0 0.0 0.0
1974 7736 0.0 0.0 0.0
1975 7687 0.0 0.0 0.0
1979 408 0.0 0.0 0.0
1980 7997 0.0 0.0 0.0
1981 8528 0.0 0.0 0.0
1982 8396 0.0 0.0 0.0
1983 8668 0.0 0.0 0.0
1984 8565 0.0 0.0 0.0
1985 8632 0.0 0.0 0.0
1986 8613 0.0 0.0 0.0
1987 8696 0.0 0.0 0.0
1988 6952 0.0 0.0 0.0
1989 7575 0.0 0.0 0.0
1990 4595 0.0 0.0 0.0
1991 8740 0.0 0.0 0.0
1992 8250 0.0 0.0 0.0
1993 8717 0.0 0.0 0.0
1994 3083 0.0 0.0 0.0
1995 8717 0.0 0.0 0.0
1996 8580 0.0 0.0 0.0
1997 8712 0.0 0.0 0.0
1998 8567 0.0 0.0 0.0
1999 8158 0.0 0.0 0.0
2000 8740 0.0 0.0 0.0
2001 7318 0.0 0.0 0.0
2002 8339 0.0 0.0 0.0
2003 8746 0.0 0.0 0.0
2004 8664 0.0 0.0 0.0
2006 5369 0.0 0.0 0.0
2007 8413 0.0 0.0 0.0
2008 7710 0.0 0.0 0.0
2009 8750 0.0 0.0 0.0
2010 8226 0.0 0.0 0.0
2011 8747 0.0 0.0 0.0
2012 8317 0.0 0.0 0.0
2013 5786 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 1467 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-03-18 No Incident Encountered 0.00 0.00

For data sources see[6]

References