If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0574212905000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.954523,"lon":-113.096526,"icon":""}]} |
Location: 00/05-29-057-21W4/0 | |
Location Alias: 00/05-29-57-21 W4M | |
Location Alias 2: 00/05-29-057-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 057 | |
Meridian: 4 | |
Range: 21 | |
Section: 29 | |
County/Municipality: Redwater | |
Well Name: ESSO REDWATER EX 5-29-57-21 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0000482 | |
License Date: 1949-08-20 | |
License Status: RecCertified | |
Spud Date: 1949-09-11 | |
Final Drill Date: 1949-10-01 | |
Well Total Depth: 997.90 m | |
Surface Hole Latitude: 53.954523 | |
Surface Hole Longitude: -113.096526 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1949-08-20 | Obtained License |
1949-09-27 | Production Casing Operation Performed |
1949-10-01 | Finished Drilling |
1949-10-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1949-10-01 | Perforation Treatment Performed - Open-Hole Completion |
1949-10-01 | Well Mode changed to Drilled and Cased |
1949-10-02 | Well Began Production |
1949-10-02 | Well Fluid changed to Crude Oil |
1949-10-02 | Well Mode changed to Flowing |
1950-05-18 | Well Fluid changed to Crude Oil |
1950-05-18 | Well Mode changed to Pumping |
1985-06-24 | Perforation Treatment Performed - Cement Plug |
1985-06-24 | Perforation Treatment Performed - Open-Hole Completion |
1989-12-01 | Well Fluid changed to Crude Oil |
1989-12-01 | Well Mode changed to Suspended |
1992-09-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-09-08 | Perforation Treatment Performed - Jet Perforation |
1992-09-08 | Plug Back Performed |
1992-09-09 | Perforation Treatment Performed - Remedial Casing |
1992-09-09 | Well Fluid changed to Crude Oil |
1992-09-09 | Well Mode changed to Abandoned |
1992-09-16 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1949-10-01 | Open Hole/Barefoot Completion | 961.60 | 997.90 | 0 |
1949-10-01 | Acid Treatment | 961.60 | 997.90 | 0 |
1985-06-24 | Cement Plug | 976.20 | 997.60 | 0 |
1985-06-24 | Open Hole/Barefoot Completion | 961.60 | 976.20 | 0 |
1992-09-08 | Packing Device Capped w/Cement | 931.00 | 939.00 | 0 |
1992-09-08 | Perforation | 183.00 | 183.50 | 7 |
1992-09-09 | Remedial Casing Cementing | 183.00 | 183.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1972 | 1902 | 0.0 | 0.0 | 0.0 |
1973 | 7888 | 0.0 | 0.0 | 0.0 |
1974 | 7618 | 0.0 | 0.0 | 0.0 |
1975 | 24 | 0.0 | 0.0 | 0.0 |
1985 | 2317 | 0.0 | 0.0 | 0.0 |
1986 | 5729 | 0.0 | 0.0 | 0.0 |
1987 | 270 | 0.0 | 0.0 | 0.0 |
1988 | 8202 | 0.0 | 0.0 | 0.0 |
1989 | 2628 | 0.0 | 0.0 | 0.0 |
For data sources see[5]