X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574213008000

Well Details

Well ID: 0574213008000
Loading map...
Location: 00/08-30-057-21W4/0
Location Alias: 00/08-30-57-21 W4M
Location Alias 2: 00/08-30-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 30
County/Municipality: Redwater
Well Name: IMP REDWATER 8-30-57-21
Operator Name: Imperial Oil Resources Limited
License Number: B0002722
License Date: 1949-03-25
License Status: RecCertified
Spud Date: 1949-04-12
Final Drill Date: 1949-04-27
Well Total Depth: 995.20 m
Surface Hole Latitude: 53.954351
Surface Hole Longitude: -113.101641

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-03-25 Obtained License
1949-04-22 Production Casing Operation Performed
1949-04-26 Perforation Treatment Performed - Open-Hole Completion
1949-04-27 Finished Drilling
1949-04-27 Well Mode changed to Drilled and Cased
1949-04-29 Well Began Production
1949-04-29 Well Fluid changed to Crude Oil
1949-04-29 Well Mode changed to Flowing
1950-08-12 Well Fluid changed to Crude Oil
1950-08-12 Well Mode changed to Pumping
1972-05-05 Perforation Treatment Performed - Cement Plug
1972-05-05 Perforation Treatment Performed - Open-Hole Completion
1972-05-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-01 Well Fluid changed to Crude Oil
1992-07-01 Well Mode changed to Suspended
1994-04-28 Well Abandoned
1994-04-28 Well Fluid changed to Crude Oil
1994-04-28 Well Mode changed to Abandoned
1995-04-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-04-12 Perforation Treatment Performed - Jet Perforation
1995-04-12 Plug Back Performed
1995-04-12 Well Log Performed
1995-04-25 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-04-26 Open Hole/Barefoot Completion 969.60 995.20 0
1972-05-05 Cement Plug 983.30 995.20 0
1972-05-05 Open Hole/Barefoot Completion 969.60 983.30 0
1972-05-13 Acid Treatment 969.60 983.30 0
1995-04-12 Packing Device Capped w/Cement 956.50 964.50 0
1995-04-12 Perforation 220.00 221.00 13
1995-04-25 Remedial Casing Cementing 220.00 221.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6466 0.0 0.0 0.0
1968 6278 0.0 0.0 0.0
1969 7213 0.0 0.0 0.0
1970 5705 0.0 0.0 0.0
1971 4712 0.0 0.0 0.0
1972 6928 0.0 0.0 0.0
1973 8291 0.0 0.0 0.0
1974 8325 0.0 0.0 0.0
1975 8375 0.0 0.0 0.0
1976 8593 0.0 0.0 0.0
1977 8096 0.0 0.0 0.0
1978 8348 0.0 0.0 0.0
1979 8115 0.0 0.0 0.0
1980 7789 0.0 0.0 0.0
1981 8149 0.0 0.0 0.0
1982 8490 0.0 0.0 0.0
1983 8380 0.0 0.0 0.0
1984 8546 0.0 0.0 0.0
1985 8397 0.0 0.0 0.0
1986 8595 0.0 0.0 0.0
1987 8601 0.0 0.0 0.0
1988 8481 0.0 0.0 0.0
1989 7661 0.0 0.0 0.0
1990 7336 0.0 0.0 0.0
1991 8690 0.0 0.0 0.0
1992 1677 0.0 0.0 0.0

For data sources see[5]

References