X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574213010000

Well Details

Well ID: 0574213010000
Loading map...
Location: 00/10-30-057-21W4/0
Location Alias: 00/10-30-57-21 W4M
Location Alias 2: 00/10-30-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 30
County/Municipality: Redwater
Well Name: ACCEL HOLDINGS REDWATER 10-30-57-21
Operator Name: ACCEL Canada Holdings Limited
License Number: B0002672
License Date: 1949-03-03
License Status: Amended
Spud Date: 1949-04-15
Final Drill Date: 1949-05-03
Well Total Depth: 995.20 m
Surface Hole Latitude: 53.958035
Surface Hole Longitude: -113.109075

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-03-03 Obtained License
1949-04-27 Production Casing Operation Performed
1949-05-03 Finished Drilling
1949-05-03 Perforation Treatment Performed - Open-Hole Completion
1949-05-03 Well Mode changed to Drilled and Cased
1949-05-14 Well Began Production
1949-05-14 Well Fluid changed to Crude Oil
1949-05-14 Well Mode changed to Flowing
1951-02-26 Well Fluid changed to Crude Oil
1951-02-26 Well Mode changed to Pumping
1982-11-11 Perforation Treatment Performed - Cement Plug
1982-11-11 Perforation Treatment Performed - Open-Hole Completion
1984-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-27 Perforation Treatment Performed - Open-Hole Completion
1996-09-30 Well Log Performed
2003-04-11 Perforation Treatment Performed - Jet Perforation
2003-04-11 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-05-03 Open Hole/Barefoot Completion 970.50 995.20 0
1982-11-11 Cement Plug 978.60 995.20 0
1982-11-11 Open Hole/Barefoot Completion 970.50 978.60 0
1984-01-26 Acid Treatment 970.50 976.30 0
1988-09-23 Acid Treatment 970.50 978.60 0
1996-09-27 Open Hole/Barefoot Completion 970.50 986.00 0
2003-04-11 Perforation 969.00 971.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1970 144 0.0 0.0 0.0
1971 4982 0.0 0.0 0.0
1972 7090 0.0 0.0 0.0
1973 8243 0.0 0.0 0.0
1974 8345 0.0 0.0 0.0
1975 8453 0.0 0.0 0.0
1976 8565 0.0 0.0 0.0
1977 3336 0.0 0.0 0.0
1978 6791 0.0 0.0 0.0
1979 6754 0.0 0.0 0.0
1980 8392 0.0 0.0 0.0
1981 7797 0.0 0.0 0.0
1982 8148 0.0 0.0 0.0
1983 8651 0.0 0.0 0.0
1984 8423 0.0 0.0 0.0
1985 7323 0.0 0.0 0.0
1986 8622 0.0 0.0 0.0
1987 8638 0.0 0.0 0.0
1988 8245 0.0 0.0 0.0
1989 8561 0.0 0.0 0.0
1990 7668 0.0 0.0 0.0
1991 8694 0.0 0.0 0.0
1992 7808 0.0 0.0 0.0
1993 8632 0.0 0.0 0.0
1994 7355 0.0 0.0 0.0
1995 8563 0.0 0.0 0.0
1996 6288 0.0 0.0 0.0
1997 8631 0.0 0.0 0.0
1998 8582 0.0 0.0 0.0
1999 8367 0.0 0.0 0.0
2000 8764 0.0 0.0 0.0
2001 8691 0.0 0.0 0.0
2002 8184 0.0 0.0 0.0
2003 4956 0.0 0.0 0.0
2004 5791 0.0 0.0 0.0
2005 3058 0.0 0.0 0.0
2008 4302 0.0 0.0 0.0
2009 8737 0.0 0.0 0.0
2010 8638 0.0 0.0 0.0
2011 4558 0.0 0.0 0.0
2012 8728 0.0 0.0 0.0
2013 6264 0.0 0.0 0.0
2014 6030 0.0 0.0 0.0
2015 8511 0.0 0.0 0.0
2016 8220 0.0 0.0 0.0
2017 8705 0.0 0.0 0.0
2018 7151 0.0 0.0 0.0
2019 6960 0.0 0.0 0.0
2020 776 0.0 0.0 0.0

For data sources see[5]

References