X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574213206000

Well Details

Well ID: 0574213206000
Loading map...
Location: 00/06-32-057-21W4/0
Location Alias: 00/06-32-57-21 W4M
Location Alias 2: 00/06-32-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 32
County/Municipality: Redwater
Well Name: ACCEL HOLDINGS REDWATER 6-32-57-21
Operator Name: ACCEL Canada Holdings Limited
License Number: 0000634
License Date: 1949-09-19
License Status: Issued
Spud Date: 1949-09-30
Final Drill Date: 1949-10-12
Well Total Depth: 978.40 m
Surface Hole Latitude: 53.968974
Surface Hole Longitude: -113.090413

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-09-19 Obtained License
1949-10-09 Production Casing Operation Performed
1949-10-12 Finished Drilling
1949-10-12 Perforation Treatment Performed - Open-Hole Completion
1949-10-12 Well Mode changed to Drilled and Cased
1949-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-10-14 Well Began Production
1949-10-14 Well Fluid changed to Crude Oil
1949-10-14 Well Mode changed to Flowing
1950-12-30 Well Fluid changed to Crude Oil
1950-12-30 Well Mode changed to Pumping
1976-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-10 Well Log Performed
2004-07-06 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-10-12 Open Hole/Barefoot Completion 924.20 978.40 0
1949-10-13 Acid Treatment 924.20 978.40 0
1976-12-02 Acid Treatment 924.20 944.30 0
1977-06-10 Acid Treatment 924.20 944.30 0
1979-11-08 Acid Treatment 924.00 936.00 0
1979-11-09 Acid Treatment 924.00 936.00 0
2004-07-06 Open Hole/Barefoot Completion 924.20 941.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1972 1922 0.0 0.0 0.0
1973 8235 0.0 0.0 0.0
1974 5913 0.0 0.0 0.0
1975 3371 0.0 0.0 0.0
1976 3224 0.0 0.0 0.0
1977 4093 0.0 0.0 0.0
1978 8169 0.0 0.0 0.0
1979 7423 0.0 0.0 0.0
1980 5269 0.0 0.0 0.0
1981 24 0.0 0.0 0.0
1982 5440 0.0 0.0 0.0
1983 8717 0.0 0.0 0.0
1984 8527 0.0 0.0 0.0
1985 8715 0.0 0.0 0.0
1986 8517 0.0 0.0 0.0
1987 8308 0.0 0.0 0.0
1988 8475 0.0 0.0 0.0
1989 8460 0.0 0.0 0.0
1990 8463 0.0 0.0 0.0
1991 8690 0.0 0.0 0.0
1992 8336 0.0 0.0 0.0
1993 8734 0.0 0.0 0.0
1994 7725 0.0 0.0 0.0
1995 8719 0.0 0.0 0.0
1996 8732 0.0 0.0 0.0
1997 8498 0.0 0.0 0.0
1998 8050 0.0 0.0 0.0
1999 8272 0.0 0.0 0.0
2000 8756 0.0 0.0 0.0
2001 8669 0.0 0.0 0.0
2002 8371 0.0 0.0 0.0
2003 8730 0.0 0.0 0.0
2004 8237 0.0 0.0 0.0
2005 8377 0.0 0.0 0.0
2006 8662 0.0 0.0 0.0
2007 8720 0.0 0.0 0.0
2008 7965 0.0 0.0 0.0
2009 8180 0.0 0.0 0.0
2010 8716 0.0 0.0 0.0
2011 8345 0.0 0.0 0.0
2012 8349 0.0 0.0 0.0
2013 7975 0.0 0.0 0.0
2014 6814 0.0 0.0 0.0
2015 8422 0.0 0.0 0.0
2016 8239 0.0 0.0 0.0
2017 8445 0.0 0.0 0.0
2018 7638 0.0 0.0 0.0
2019 7546 0.0 0.0 0.0
2020 2161 0.0 0.0 0.0

For data sources see[5]

References