X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574222509000

Well Details

Well ID: 0574222509000
Loading map...
Location: 00/09-25-057-22W4/0
Location Alias: 00/09-25-57-22 W4M
Location Alias 2: 00/09-25-057-22 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 22
Section: 25
County/Municipality: Redwater
Well Name: IMPERIAL REDWATER NO. 5 WELL
Operator Name: Imperial Oil Limited
License Number: B0002414
License Date: 1948-10-19
License Status: RecExempt
Spud Date: 1948-11-25
Final Drill Date: 1949-01-10
Well Total Depth: 1018.30 m
Surface Hole Latitude: 53.958017
Surface Hole Longitude: -113.127734

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-10-19 Obtained License
1949-01-01 Production Casing Operation Performed
1949-01-06 Drill Stem Test Performed
1949-01-08 Drill Stem Test Performed
1949-01-09 Drill Stem Test Performed
1949-01-10 Drill Stem Test Performed
1949-01-10 Finished Drilling
1949-01-10 Perforation Treatment Performed - Open-Hole Completion
1949-01-11 Perforation Treatment Performed - Cement Plug
1949-01-11 Perforation Treatment Performed - Open-Hole Completion
1949-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-01-14 Perforation Treatment Performed - Bullet Perforation
1949-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-01-16 Drill Stem Test Performed
1949-01-16 Perforation Treatment Performed - Bullet Perforation
1949-01-16 Perforation Treatment Performed - Cement Plug
1949-01-20 Drill Stem Test Performed
1949-01-21 Drill Stem Test Performed
1949-01-22 Drill Stem Test Performed
1949-01-24 Drill Stem Test Performed
1949-01-24 Perforation Treatment Performed - Bullet Perforation
1949-01-24 Perforation Treatment Performed - Cement Plug
1949-01-25 Drill Stem Test Performed
1949-01-27 Perforation Treatment Performed - Cement Plug
1949-01-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-01-10 Open Hole/Barefoot Completion 1002.80 1018.30 0
1949-01-16 Bullet Perforation 759.00 765.00 10
1949-01-16 Bullet Perforation 777.20 780.30 10
1949-01-16 Bullet Perforation 746.80 749.80 10
1949-01-16 Bullet Perforation 707.10 713.20 10
1949-01-16 Bullet Perforation 682.80 690.40 10
1949-01-16 Bullet Perforation 667.50 670.60 10
1949-01-24 Cement Plug 655.30 826.00 0
1949-01-24 Bullet Perforation 650.70 653.80 10
1949-01-27 Cement Plug 438.30 453.50 0
1949-01-11 Cement Plug 1010.40 1018.30 0
1949-01-11 Open Hole/Barefoot Completion 1002.80 1010.40 0
1949-01-13 Acid Treatment 1002.80 1010.40 0
1949-01-14 Bullet Perforation 1005.80 1011.30 10
1949-01-15 Acid Treatment 1005.80 1011.30 0
1949-01-16 Cement Plug 963.20 1005.80 0
1949-01-16 Bullet Perforation 823.00 826.00 10
1949-01-16 Bullet Perforation 786.40 789.40 10

For data sources see[4]



References