X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575051402000

Well Details

Well ID: 0575051402000
Loading map...
Location: 00/02-14-057-05W5/0
Location Alias: 00/02-14-57-05 W5M
Location Alias 2: 00/02-14-057-05 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 05
Section: 14
County/Municipality: Lac Ste. Anne County
Well Name: APACHE CHERHILL 2-14-57-5
Operator Name: Brae Canada Ltd.
License Number: 0043924
License Date: 1972-10-20
License Status: RecCertified
Spud Date: 1972-10-22
Final Drill Date: 1972-10-27
Well Total Depth: 1334.10 m
Surface Hole Latitude: 53.921494
Surface Hole Longitude: -114.630000

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-10-20 Obtained License
1972-10-27 Finished Drilling
1972-10-27 Well Mode changed to Drilled and Cased
1972-10-29 Drill Stem Test Performed
1972-10-30 Drill Stem Test Performed
1972-11-01 Production Casing Operation Performed
1972-11-09 Perforation Treatment Performed - Jet Perforation
1972-11-10 Perforation Treatment Performed - Fractured
1972-11-18 Well Began Production
1972-11-18 Well Fluid changed to Crude Oil
1972-11-18 Well Mode changed to Pumping
1973-01-01 Well Fluid changed to Crude Oil
1973-01-01 Well Mode changed to Suspended
1973-05-31 Well Fluid changed to Crude Oil
1973-05-31 Well Mode changed to Pumping
1974-01-01 Well Fluid changed to Crude Oil
1974-01-01 Well Mode changed to Suspended
1974-08-01 Well Fluid changed to Crude Oil
1974-08-01 Well Mode changed to Pumping
1976-12-10 Well Fluid changed to Crude Oil
1976-12-10 Well Mode changed to Suspended
1979-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-08-30 Well Abandoned
1979-08-30 Well Fluid changed to Crude Oil
1979-08-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-11-09 Perforation 1270.10 1278.90 3
1972-11-10 Fracture 1270.10 1278.90 0
1979-08-30 Packing Device Capped w/Cement 1264.70 1264.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 315 0.0 0.0 0.0
1973 3264 0.0 0.0 0.0
1974 1116 0.0 0.0 0.0
1975 2023 0.0 0.0 0.0
1976 3397 0.0 0.0 0.0

For data sources see[5]

References