X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575083207000

Well Details

Well ID: 0575083207000
Loading map...
Location: 00/07-32-057-08W5/0
Location Alias: 00/07-32-57-08 W5M
Location Alias 2: 00/07-32-057-08 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 08
Section: 32
County/Municipality: Lac Ste. Anne County
Well Name: ESSO PADDLE RIVER 7-32-57-8
Operator Name: TAQA North Ltd.
License Number: 0045902
License Date: 1973-05-25
License Status: Abandoned
Spud Date: 1973-06-05
Final Drill Date: 1973-06-14
Well Total Depth: 1490.50 m
Surface Hole Latitude: 53.966538
Surface Hole Longitude: -115.149369

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-05-25 Obtained License
1973-06-14 Finished Drilling
1973-06-15 Drill Stem Test Performed
1973-06-16 Production Casing Operation Performed
1973-06-17 Well Mode changed to Drilled and Cased
1976-07-28 Perforation Treatment Performed - Jet Perforation
1976-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-10-19 Well Began Production
1976-10-19 Well Fluid changed to Gas
1976-10-19 Well Mode changed to Flowing
1989-03-09 Perforation Treatment Performed - Chemical Squeeze
1993-08-01 Well Fluid changed to Gas
1993-08-01 Well Mode changed to Suspended
2000-09-23 Well Fluid changed to Gas
2000-09-23 Well Mode changed to Flowing
2002-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-28 Perforation Treatment Performed - Jet Perforation
2002-06-28 Plug Back Performed
2002-06-28 Well Fluid changed to Gas
2002-06-28 Well Mode changed to Abandoned Zone
2002-06-29 Perforation Treatment Performed - Remedial Casing
2002-08-30 Well Abandoned
2002-08-30 Well Fluid changed to Gas
2002-08-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-07-28 Perforation 1455.10 1466.10 7
1976-07-29 Acid Treatment 1455.10 1466.10 0
1989-03-09 Chemical Squeeze 1455.10 1466.10 0
2002-06-28 Packing Device Capped w/Cement 1420.00 1428.00 0
2002-06-28 Perforation 600.00 601.00 14
2002-06-29 Remedial Casing Cementing 600.00 601.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 856 0.0 0.0 0.0
1977 5864 0.0 0.0 0.0
1978 3854 0.0 0.0 0.0
1979 6647 0.0 0.0 0.0
1980 8336 0.0 0.0 0.0
1981 7335 0.0 0.0 0.0
1982 7156 0.0 0.0 0.0
1983 8267 0.0 0.0 0.0
1984 7206 0.0 0.0 0.0
1985 7627 0.0 0.0 0.0
1986 7428 0.0 0.0 0.0
1987 6801 0.0 0.0 0.0
1988 4243 0.0 0.0 0.0
1989 6361 0.0 0.0 0.0
1990 7511 0.0 0.0 0.0
1991 6215 0.0 0.0 0.0
1992 3480 0.0 0.0 0.0
1993 4919 0.0 0.0 0.0
2000 1077 0.0 0.0 0.0

For data sources see[5]

References