X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575171202000

Well Details

Well ID: 0575171202000
Loading map...
Location: 00/02-12-057-17W5/0
Location Alias: 00/02-12-57-17 W5M
Location Alias 2: 00/02-12-057-17 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 17
Section: 12
County/Municipality: Yellowhead County
Well Name: DAYLIGHT ET AL BRONSON 2-12-57-17
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0122717
License Date: 1986-02-27
License Status: Abandoned
Spud Date: 1986-03-10
Final Drill Date: 1986-03-31
Well Total Depth: 3324.00 m
Surface Hole Latitude: 53.908135
Surface Hole Longitude: -116.389097

For data sources see[1][2]

Well History

Date Event
1986-02-27 Obtained License
1986-03-11 Surface Casing Operation Performed
1986-03-31 Finished Drilling
1986-04-01 Well Log Performed
1986-04-02 Drill Stem Test Performed
1986-04-03 Drill Stem Test Performed
1986-04-04 Plug Back Performed
1986-04-04 Well Log Performed
1986-04-06 Production Casing Operation Performed
1986-04-06 Rig Released
1986-04-18 Well Log Performed
1986-09-18 Well Log Performed
1986-09-20 Perforation Treatment Performed - Jet Perforation
1986-09-30 Well Mode changed to Drilled and Cased
1993-12-24 Well Began Production
1993-12-24 Well Fluid changed to Gas
1993-12-24 Well Mode changed to Flowing
1995-03-17 Well Fluid changed to Gas
1995-03-17 Well Mode changed to Suspended
1996-03-18 Well Fluid changed to Gas
1996-03-18 Well Mode changed to Flowing
1998-01-21 Perforation Treatment Performed - Jet Perforation
1998-01-25 Perforation Treatment Performed - Fractured
2011-07-01 Well Fluid changed to Gas
2011-07-01 Well Mode changed to Suspended
2011-10-30 Well Log Performed
2019-06-19 Well Log Performed
2019-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-06-20 Perforation Treatment Performed - Cement Squeeze
2019-06-20 Plug Back Performed
2019-06-20 Well Fluid changed to Gas
2019-06-20 Well Mode changed to Abandoned Zone
2019-06-21 Perforation Treatment Performed - Jet Perforation
2019-06-21 Well Log Performed
2019-06-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-06-22 Perforation Treatment Performed - Remedial Casing
2019-06-22 Well Log Performed
2019-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-06-23 Perforation Treatment Performed - Jet Perforation
2019-06-23 Perforation Treatment Performed - Remedial Casing
2019-06-23 Well Log Performed
2019-06-24 Perforation Treatment Performed - Jet Perforation
2019-06-24 Perforation Treatment Performed - Remedial Casing
2019-06-24 Well Log Performed
2019-06-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-06-25 Perforation Treatment Performed - Jet Perforation
2019-06-25 Perforation Treatment Performed - Remedial Casing
2019-06-25 Well Log Performed
2019-06-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-06-26 Perforation Treatment Performed - Jet Perforation
2019-06-26 Well Log Performed
2019-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-06-27 Perforation Treatment Performed - Remedial Casing
2019-08-29 Well Abandoned
2019-08-29 Well Fluid changed to Gas
2019-08-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-09-20 Perforation 2729.00 2730.50 13
1998-01-21 Perforation 2730.50 2731.00 16
1998-01-21 Perforation 2727.00 2729.00 16
1998-01-25 Fracture 2727.00 2786.50 0
2019-06-20 Cement Squeeze 2727.00 2786.50 0
2019-06-20 Packing Device Capped w/Cement 2541.80 2683.50 0
2019-06-21 Perforation 1439.00 1441.00 17
2019-06-22 Remedial Casing Cementing 1439.00 1441.00 0
2019-06-22 Packing Device Capped w/Cement 1418.80 1434.00 0
2019-06-23 Perforation 1127.00 1129.00 17
2019-06-23 Remedial Casing Cementing 1127.00 1129.00 0
1998-01-21 Perforation 2785.00 2786.50 16
2019-06-23 Packing Device Capped w/Cement 1118.80 1123.00 0
2019-06-24 Perforation 598.00 600.00 17
2019-06-24 Remedial Casing Cementing 598.00 600.00 0
2019-06-25 Packing Device Capped w/Cement 585.70 594.00 0
2019-06-25 Perforation 494.00 495.00 17
2019-06-25 Remedial Casing Cementing 494.00 495.00 0
2019-06-26 Packing Device Capped w/Cement 481.60 490.00 0
2019-06-26 Perforation 457.00 458.00 17
2019-06-27 Remedial Casing Cementing 457.00 458.00 0
2019-06-27 Packing Device Capped w/Cement 445.60 453.00 0
1998-01-21 Perforation 2781.50 2783.50 16
1998-01-21 Perforation 2780.00 2781.00 16
1998-01-21 Perforation 2773.00 2775.50 16
1998-01-21 Perforation 2767.50 2771.00 16
1998-01-21 Perforation 2765.00 2766.00 16
1998-01-21 Perforation 2737.00 2745.00 16
1998-01-21 Perforation 2732.00 2734.50 16

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 148 0.0 0.0 0.0
1993 71 0.0 0.0 0.0
1994 8304 0.0 0.0 0.0
1995 1590 0.0 0.0 0.0
1996 6772 0.0 0.0 0.0
1997 8074 0.0 0.0 0.0
1998 6613 0.0 0.0 0.0
1999 5848 0.0 0.0 0.0
2000 7270 0.0 0.0 0.0
2001 7815 0.0 0.0 0.0
2002 8466 0.0 0.0 0.0
2003 8482 0.0 0.0 0.0
2004 8331 0.0 0.0 0.0
2005 8714 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8111 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 6575 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-08-29 No Incident Encountered 0.00 0.00

For data sources see[6]

References