X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575181308000

Well Details

Well ID: 0575181308000
Loading map...
Location: 00/08-13-057-18W5/0
Location Alias: 00/08-13-57-18 W5M
Location Alias 2: 00/08-13-057-18 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 18
Section: 13
County/Municipality: Yellowhead County
Well Name: ROGCI HZ PINE CK 8-13-57-18
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0484531
License Date: 2017-07-14
License Status: Amended
Spud Date: 2018-02-25
Final Drill Date: 2018-03-23
Well Total Depth: 6134.00 m
Surface Hole Latitude: 53.935484
Surface Hole Longitude: -116.562021

For data sources see[1][2]

Well History

Date Event
2017-07-14 Obtained License
2018-02-26 Surface Casing Operation Performed
2018-02-28 Direction Drilling Operation Performed - Deviate
2018-03-06 Intermediate Casing Operation Performed
2018-03-15 Direction Drilling Operation Performed - Horizontal
2018-03-16 Well Log Performed
2018-03-23 Finished Drilling
2018-03-23 Perforation Treatment Performed - Open-Hole Completion
2018-03-23 Well Log Performed
2018-03-23 Well Mode changed to Drilled and Cased
2018-03-24 Well Log Performed
2018-03-26 Well Log Performed
2018-03-28 Production Casing Operation Performed
2018-03-30 Rig Released
2018-08-20 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-21 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-22 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-24 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-31 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-01 Well Fluid changed to Shale Gas Only
2018-10-01 Well Mode changed to Testing
2018-11-28 Well Began Production
2018-11-28 Well Fluid changed to Shale Gas Only
2018-11-28 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-02-25 Patterson-UTI Drilling Co. Canada 811 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-02-28 821.00 Deviate (5 - 79 degrees)
2018-03-15 3831.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-23 Open Hole/Barefoot Completion 6120.00 6134.00 0
2018-08-23 Multi-Stage Fracture 5534.00 5565.00 0
2018-08-24 Multi-Stage Fracture 5476.00 5520.20 0
2018-08-24 Multi-Stage Fracture 5415.00 5446.00 0
2018-08-24 Multi-Stage Fracture 5361.00 5389.00 0
2018-08-25 Multi-Stage Fracture 5305.00 5328.00 0
2018-08-25 Multi-Stage Fracture 5239.00 5273.00 0
2018-08-25 Multi-Stage Fracture 5177.00 5211.00 0
2018-08-26 Multi-Stage Fracture 5111.00 5155.00 0
2018-08-26 Multi-Stage Fracture 5059.00 5090.00 0
2018-08-27 Multi-Stage Fracture 4996.00 5032.00 0
2018-08-20 Multi-Stage Fracture 6019.00 6078.00 0
2018-08-27 Multi-Stage Fracture 4935.00 4973.00 0
2018-08-27 Multi-Stage Fracture 4883.00 4916.00 0
2018-08-27 Multi-Stage Fracture 4812.00 4849.00 0
2018-08-28 Multi-Stage Fracture 4753.00 4790.00 0
2018-08-28 Multi-Stage Fracture 4698.00 4724.00 0
2018-08-28 Multi-Stage Fracture 4651.00 4663.00 0
2018-08-29 Multi-Stage Fracture 4572.00 4608.00 0
2018-08-29 Multi-Stage Fracture 4519.00 4546.00 0
2018-08-30 Multi-Stage Fracture 4466.00 4489.00 0
2018-08-30 Multi-Stage Fracture 4394.00 4432.00 0
2018-08-20 Multi-Stage Fracture 5959.00 5989.00 0
2018-08-30 Multi-Stage Fracture 4335.00 4366.00 0
2018-08-31 Multi-Stage Fracture 4278.00 4308.00 0
2018-08-31 Multi-Stage Fracture 4218.00 4254.00 0
2018-08-31 Multi-Stage Fracture 4156.00 4191.00 0
2018-08-31 Multi-Stage Fracture 4100.00 4131.00 0
2018-09-01 Multi-Stage Fracture 4038.00 4069.00 0
2018-09-01 Multi-Stage Fracture 3980.00 4009.00 0
2018-09-01 Multi-Stage Fracture 3917.00 3949.00 0
2018-09-02 Multi-Stage Fracture 3858.00 3890.00 0
2018-08-21 Multi-Stage Fracture 5902.00 5928.00 0
2018-08-21 Multi-Stage Fracture 5840.00 5869.00 0
2018-08-21 Multi-Stage Fracture 5779.00 5810.00 0
2018-08-22 Multi-Stage Fracture 5721.00 5750.00 0
2018-08-22 Multi-Stage Fracture 5662.00 5681.00 0
2018-08-22 Multi-Stage Fracture 5598.00 5629.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-20 2018-09-02 3,632 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* 7732-18-5 100 88.1973 N/A
Acid/Slickwater/HVFR Schlumberger Quartz. Crystalline silica 14808-60-7 100 5.8056 N/A
Acid/Slickwater/HVFR Schlumberger Energizing Fluid 1.2.4 Trimethylbenzene (impurity) 95-63-6 100 0 N/A
2-Propen-1-aminium. N.N-dimethyl-N-2-propen-1-yl-. chloride 26062-79-3 100 0 N/A
2-Propenamid (impurity) 79-06-1 100 0 N/A
2-Propenoic acid. polymer with 2-propenamide. sodium salt 25987-30-8 100 0.0446 N/A
Acetic acid (impurity) 64-19-7 100 0.001 N/A
Acetic acid. potassium salt 127-08-2 100 0 N/A
Acetophenone 98-86-2 100 0 N/A
Acrylamide. 2-acrylamido-2-methylpropanesulfonic
acid. sodiu
38193-60-1 100 0.0065 N/A
Alcohol. C11-14. ethoxylated 78330-21-9 100 0.0006 N/A
Alcohol. C9-C11. Ethoxylated 68439-46-3 100 0.0001 N/A
Alcohols. C10-16. ethoxylated 68002-97-1 100 0.0001 N/A
Alcohols. C11-15-secondary. ethoxylated 68131-40-8 100 0.0031 N/A
Alcohols. C7-9-iso-. C8-rich. ethoxylated 78330-19-5 100 0 N/A
Alcohols. C9-11-iso-. C10-rich 68526-85-2 100 0.0002 N/A
Alcohols. C9-11-iso-. C10-rich. ethoxylated 78330-20-8 100 0 N/A
Amines. dicoco alkylmethyl 61788-62-3 100 0 N/A
Amines. tallow alkyl. ethoxylated 61791-26-2 100 0 N/A
Benzenemethanaminium. N.N-dimethyl-N tetradecyl-. chloride 139-08-2 100 0 N/A
Benzenemethanaminium. N-hexadecylN.N dimethyl-.chloride 122-18-9 100 0 N/A
benzododecinium chloride 139-07-1 100 0 N/A
Cinnamaldehyde 104-55-2 100 0.0002 N/A
Copper(II) sulfate 7758-98-7 100 0 N/A
Diammonium peroxodisulphate 7727-54-0 100 0.0028 N/A
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 100 0.0004 N/A
Disodium hydroxyethylethylenediaminediacetate (impurity) 62099-15-4 100 0 N/A
Distillates. petroleum. hydrotreated light 64742-47-8 100 0.0377 N/A
Ethoxylated propoxylated 4-nonylphenol-formaldehyde resin 30846-35-6 100 0 N/A
Ethylene glycol 107-21-1 100 0.0036 N/A
Formaldehyde (impurity) 50-00-0 100 0 N/A
Formic acid 64-18-6 100 0.0021 N/A
Hydrochloric acid 7647-01-0 100 0.0629 N/A
Hydroxyethylethylenediaminetriacetic Acid. Trisodium Salt 139-89-9 100 0.0015 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0 N/A
Methanol 67-56-1 100 0.0057 N/A
N-Coco. 1.3-diaminopropane di-acetate 61791-64-8 100 0.0022 N/A
Naphthalene (Impurity) 91-20-3 100 0 N/A
Nitrilotriacetic acid trisodium salt (Impurity) 5064-31-3 100 0 N/A
Oxirane. Methyl-. polymer with Oxirane 11/6/9003 100 0.0001 N/A
Poly(oxy-1.2-ethanediyl).a-hydro-w-hydroxy-
Ethane-1.2-diol.
25322-68-3 100 0 N/A
poly(tetrafluoroethylene) 9002-84-0 100 0 N/A
Polyethylene glycol monohexyl ether 31726-34-8 100 0.0049 N/A
Potassium oleate 143-18-0 100 0 N/A
Propan-2-ol 67-63-0 100 0 N/A
Reaction product of: acetophenone.
formaldehyde. cyclohexyla
224635-63-6 100 0.0004 N/A
Sodium chloride 7647-14-5 100 0.0034 N/A
Sodium Glycolate (impurity) 2836-32-0 100 0 N/A
Sodium hydroxide (impurity) 1310-73-2 100 0 N/A
Sodium salt of Polymaleic Acid Copolymer 111560-38-4 100 0.001 N/A
Solvent naphtha (petroleum). heavy arom. 64742-94-5 100 0 N/A
Sorbitan monooleate. ethoxylated 9005-65-6 100 0.0002 N/A
Sorbitan. mono-(9Z)-9-octadecenoate 1338-43-8 100 0.0035 N/A
Tetrasodium ethylenediaminetetraacetate 64-02-8 100 0 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0006 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-08-19 2018-09-03 Central Water Distribution Facility 40365

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 1001 0.0 0.0 0.0
2019 4934 0.0 0.0 0.0
2020 2129 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-04-03 No Incident Encountered 0.00 0.00
2018-10-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References