If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0575201214002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.915914,"lon":-116.839074,"icon":""}]} |
| Location: 00/14-12-057-20W5/2 | |
| Location Alias: 00/14-12-57-20 W5M | |
| Location Alias 2: 00/14-12-057-20 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 057 | |
| Meridian: 5 | |
| Range: 20 | |
| Section: 12 | |
| County/Municipality: Yellowhead County | |
| Well Name: ACL PINE CK 14-12-57-20 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0147454 | |
| License Date: 1991-01-17 | |
| License Status: Issued | |
| Spud Date: 1991-02-21 | |
| Final Drill Date: 1991-03-16 | |
| Well Total Depth: 2915.00 m | |
| Surface Hole Latitude: 53.915914 | |
| Surface Hole Longitude: -116.839074 |
| Date | Event |
|---|---|
| 1991-01-17 | Obtained License |
| 1991-02-21 | Well Log Performed |
| 1991-02-24 | Surface Casing Operation Performed |
| 1991-03-16 | Finished Drilling |
| 1991-03-16 | Well Mode changed to Drilled and Cased |
| 1991-03-17 | Well Log Performed |
| 1991-03-18 | Well Log Performed |
| 1991-03-20 | Production Casing Operation Performed |
| 1991-03-21 | Rig Released |
| 1991-07-16 | Well Log Performed |
| 1991-08-12 | Perforation Treatment Performed - Jet Perforation |
| 1991-08-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1991-08-15 | Plug Back Performed |
| 1991-08-20 | Perforation Treatment Performed - Jet Perforation |
| 1991-08-21 | Perforation Treatment Performed - Fractured |
| 1994-06-13 | Well Log Performed |
| 1994-06-14 | Perforation Treatment Performed - Jet Perforation |
| 1994-06-18 | Perforation Treatment Performed - Fractured |
| 1994-07-27 | Well Began Production |
| 1994-07-27 | Well Fluid changed to Gas |
| 1994-07-27 | Well Mode changed to Flowing |
| 1997-08-01 | Well Fluid changed to Gas |
| 1997-08-01 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1991-08-12 | Perforation | 2800.00 | 2806.00 | 13 |
| 1991-08-15 | Packing Device Capped w/Cement | 2784.00 | 2793.00 | 0 |
| 1991-08-20 | Perforation | 2742.50 | 2758.00 | 13 |
| 1991-08-21 | Fracture | 2742.50 | 2758.00 | 0 |
| 1994-06-14 | Perforation | 2662.00 | 2682.00 | 13 |
| 1994-06-18 | Fracture | 2662.00 | 2682.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1994 | 3061 | 0.0 | 0.0 | 0.0 |
| 1995 | 5426 | 0.0 | 0.0 | 0.0 |
| 1996 | 3171 | 0.0 | 0.0 | 0.0 |
| 1997 | 197 | 0.0 | 0.0 | 0.0 |
For data sources see[5]