If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0575230709000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.915867,"lon":-117.401114,"icon":""}]} |
| Location: 00/09-07-057-23W5/0 | |
| Location Alias: 00/09-07-57-23 W5M | |
| Location Alias 2: 00/09-07-057-23 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 057 | |
| Meridian: 5 | |
| Range: 23 | |
| Section: 07 | |
| County/Municipality: Yellowhead County | |
| Well Name: TALISMAN WILD RIV 9-7-57-23 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0438433 | |
| License Date: 2011-11-03 | |
| License Status: Issued | |
| Spud Date: 2012-02-14 | |
| Final Drill Date: 2012-02-26 | |
| Well Total Depth: 3072.00 m | |
| Surface Hole Latitude: 53.915867 | |
| Surface Hole Longitude: -117.401114 |
| Date | Event |
|---|---|
| 2011-11-03 | Obtained License |
| 2012-02-17 | Surface Casing Operation Performed |
| 2012-02-18 | Direction Drilling Operation Performed - Deviate |
| 2012-02-26 | Finished Drilling |
| 2012-02-26 | Well Log Performed |
| 2012-02-26 | Well Mode changed to Drilled and Cased |
| 2012-02-27 | Production Casing Operation Performed |
| 2012-02-28 | Rig Released |
| 2012-09-19 | Perforation Treatment Performed - Jet Perforation |
| 2012-09-23 | Perforation Treatment Performed - Fractured |
| 2012-09-23 | Perforation Treatment Performed - Jet Perforation |
| 2012-09-24 | Perforation Treatment Performed - Fractured |
| 2012-09-24 | Perforation Treatment Performed - Jet Perforation |
| 2012-09-25 | Perforation Treatment Performed - Fractured |
| 2012-09-27 | Well Fluid changed to Gas |
| 2012-09-27 | Well Mode changed to Testing |
| 2012-10-16 | Well Began Production |
| 2012-10-16 | Well Fluid changed to Gas |
| 2012-10-16 | Well Mode changed to Flowing |
| 2014-01-01 | Well Fluid changed to Gas |
| 2014-01-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-02-14 | Nabors Drilling Limited | 28 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-02-18 | 952.00 | Deviate (5 - 79 degrees) |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-09-19 | Perforation | 3046.00 | 3046.50 | 13 |
| 2012-09-23 | Perforation | 2924.50 | 2925.00 | 13 |
| 2012-09-23 | Fracture | 3043.00 | 3056.00 | 0 |
| 2012-09-23 | Perforation | 2886.00 | 2886.50 | 13 |
| 2012-09-24 | Perforation | 2542.50 | 2543.10 | 12 |
| 2012-09-24 | Perforation | 2547.50 | 2548.10 | 12 |
| 2012-09-24 | Fracture | 2686.00 | 2700.60 | 0 |
| 2012-09-24 | Perforation | 2524.50 | 2525.10 | 12 |
| 2012-09-24 | Perforation | 2527.50 | 2528.10 | 12 |
| 2012-09-24 | Perforation | 2531.50 | 2532.10 | 12 |
| 2012-09-24 | Perforation | 2700.00 | 2700.60 | 12 |
| 2012-09-19 | Perforation | 3043.00 | 3043.50 | 13 |
| 2012-09-24 | Fracture | 2852.00 | 2886.50 | 0 |
| 2012-09-24 | Fracture | 2924.50 | 2925.00 | 0 |
| 2012-09-24 | Perforation | 2686.00 | 2686.60 | 12 |
| 2012-09-24 | Perforation | 2689.00 | 2689.60 | 12 |
| 2012-09-24 | Perforation | 2692.00 | 2692.60 | 12 |
| 2012-09-25 | Fracture | 2524.50 | 2548.10 | 0 |
| 2012-09-19 | Perforation | 3048.50 | 3049.00 | 13 |
| 2012-09-19 | Perforation | 3055.50 | 3056.00 | 13 |
| 2012-09-19 | Perforation | 3051.50 | 3052.00 | 13 |
| 2012-09-23 | Perforation | 2860.50 | 2861.00 | 13 |
| 2012-09-23 | Perforation | 2883.00 | 2883.50 | 13 |
| 2012-09-23 | Perforation | 2852.00 | 2852.50 | 13 |
| 2012-09-23 | Perforation | 2857.00 | 2857.50 | 13 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 2229 | 0.0 | 0.0 | 0.0 |
| 2013 | 8433 | 0.0 | 0.0 | 0.0 |
| 2014 | 8759 | 0.0 | 0.0 | 0.0 |
| 2015 | 8748 | 0.0 | 0.0 | 0.0 |
| 2016 | 8667 | 0.0 | 0.0 | 0.0 |
| 2017 | 8328 | 0.0 | 0.0 | 0.0 |
| 2018 | 7126 | 0.0 | 0.0 | 0.0 |
| 2019 | 7248 | 0.0 | 0.0 | 0.0 |
| 2020 | 2112 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-10-01 | No Incident Encountered | 0.00 | 0.00 |
| 2012-10-01 | No Incident Encountered | 0.00 | 0.00 |
| 2012-10-01 | No Incident Encountered | 0.00 | 0.00 |
| 2012-10-01 | No Incident Encountered | 0.00 | 0.00 |
| 2012-10-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]