X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575232908000

Well Details

Well ID: 0575232908000
Loading map...
Location: 00/08-29-057-23W5/0
Location Alias: 00/08-29-57-23 W5M
Location Alias 2: 00/08-29-057-23 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 23
Section: 29
County/Municipality: Yellowhead County
Well Name: TALISMAN ETAL HZ WILD RIV 8-29-57-23
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0477786
License Date: 2015-11-20
License Status: Issued
Spud Date: 2016-01-20
Final Drill Date: 2016-02-04
Well Total Depth: 4748.00 m
Surface Hole Latitude: 53.955439
Surface Hole Longitude: -117.405750

For data sources see[1][2]

Well History

Date Event
2015-11-20 Obtained License
2016-01-21 Surface Casing Operation Performed
2016-01-26 Direction Drilling Operation Performed - Deviate
2016-01-28 Direction Drilling Operation Performed - Horizontal
2016-01-29 Well Log Performed
2016-01-30 Intermediate Casing Operation Performed
2016-02-01 Well Log Performed
2016-02-04 Finished Drilling
2016-02-04 Well Log Performed
2016-02-04 Well Mode changed to Drilled and Cased
2016-02-05 Well Log Performed
2016-02-07 Production Casing Operation Performed
2016-02-07 Well Log Performed
2016-02-08 Perforation Treatment Performed - Open-Hole Completion
2016-02-08 Rig Released
2016-02-14 Well Log Performed
2016-02-29 Perforation Treatment Performed - Multi-Stage Fracture
2016-03-01 Perforation Treatment Performed - Multi-Stage Fracture
2016-03-06 Well Fluid changed to Gas
2016-03-06 Well Mode changed to Testing
2016-06-15 Well Began Production
2016-06-15 Well Fluid changed to Gas
2016-06-15 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-01-20 Trinidad Drilling Ltd. 60 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-01-26 2393.40 Deviate (5 - 79 degrees)
2016-01-28 2835.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-02-08 Open Hole/Barefoot Completion 4742.60 4748.00 0
2016-02-29 Multi-Stage Fracture 3924.90 3925.00 0
2016-02-29 Multi-Stage Fracture 3828.00 3828.10 0
2016-02-29 Multi-Stage Fracture 3744.00 3744.10 0
2016-02-29 Multi-Stage Fracture 3646.60 3646.70 0
2016-02-29 Multi-Stage Fracture 3562.70 3562.80 0
2016-02-29 Multi-Stage Fracture 3478.90 3479.00 0
2016-02-29 Multi-Stage Fracture 3408.70 3408.80 0
2016-02-29 Multi-Stage Fracture 3338.40 3338.50 0
2016-02-29 Multi-Stage Fracture 3268.20 3268.30 0
2016-03-01 Multi-Stage Fracture 3170.70 3170.80 0
2016-02-29 Multi-Stage Fracture 4703.90 4704.00 0
2016-03-01 Multi-Stage Fracture 3073.10 3073.20 0
2016-03-01 Multi-Stage Fracture 2962.00 2962.10 0
2016-02-29 Multi-Stage Fracture 4604.80 4604.90 0
2016-02-29 Multi-Stage Fracture 4507.70 4507.80 0
2016-02-29 Multi-Stage Fracture 4410.30 4410.40 0
2016-02-29 Multi-Stage Fracture 4312.80 4312.90 0
2016-02-29 Multi-Stage Fracture 4215.40 4215.50 0
2016-02-29 Multi-Stage Fracture 4119.90 4120.00 0
2016-02-29 Multi-Stage Fracture 4022.40 4022.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-02-29 2016-03-01 2,701 4,001 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 3.691 N/A
water Not Available 100 73.6557 N/A
Prime Plus 30/50 Trican hexamethylenetetramine 100-97-0 100 5.7577 N/A
silica crystalline 14808-60-7 100 5.7577 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 16.1349 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 0.4391 N/A
Myacide GA-50 Trican Bactericide/Biocide glutaraldehyde 111-30-8 100 0.0166 N/A
non-hazardous ingredients Not Available 100 0.0166 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1377 N/A
non-hazardous ingredients Not Available 100 0.1377 N/A
GFR-1 Trican Friction Reducer non-hazardous ingredients Not Available 100 0.0928 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0058 N/A
methanol 67-56-1 100 0.0058 N/A
water Not Available 100 0.0058 N/A
SS-5 Trican Surfactant aliphatic alcohol 8985 100 0.0682 N/A
aminofunctional polymer 8985 100 0.0682 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.0682 N/A
isopropanol 67-63-0 100 0.0682 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-01-14 2016-01-29 Groundwater - Non-saline less than or equal to 150m deep 3017
2016-01-17 2016-01-29 Groundwater - Non-saline less than or equal to 150m deep 2059
2016-01-24 2016-01-24 Surface Water - River 600
2016-01-14 2016-01-16 Municipal Water 230

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 4639 0.0 0.0 0.0
2017 8438 0.0 0.0 0.0
2018 8049 0.0 0.0 0.0
2019 8147 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-02-08 No Incident Encountered 0.00 0.00
2016-03-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References