X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584041805023

Well Details

Well ID: 0584041805023
Loading map...
Location: 02/05-18-058-04W4/3
Location Alias: 02/05-18-58-04 W4M
Location Alias 2: 02/05-18-058-04 W4/03
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 04
Section: 18
County/Municipality: County of St. Paul No. 19
Well Name: CNRL 5A LIND 5-18-58-4
Operator Name: Canadian Natural Resources Limited
License Number: 0114101
License Date: 1985-03-25
License Status: Abandoned
Spud Date: 1985-03-25
Final Drill Date: 1985-03-30
Well Total Depth: 614.00 m
Surface Hole Latitude: 54.011101
Surface Hole Longitude: -110.595775

For data sources see[1][2]

Well History

Date Event
1985-03-25 Obtained License
1985-03-27 Surface Casing Operation Performed
1985-03-29 Production Casing Operation Performed
1985-03-29 Well Log Performed
1985-03-30 Finished Drilling
1985-03-30 Perforation Treatment Performed - Open-Hole Completion
1985-03-30 Rig Released
1985-03-30 Well Mode changed to Drilled and Cased
1985-04-30 Well Log Performed
1985-05-29 Well Log Performed
1985-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-11-23 Plug Back Performed
2006-05-13 Well Log Performed
2006-05-19 Perforation Treatment Performed - Jet Perforation
2006-05-19 Well Log Performed
2009-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-07-15 Perforation Treatment Performed - Jet Perforation
2009-07-15 Plug Back Performed
2009-07-16 Well Began Production
2009-07-16 Well Fluid changed to Crude Bitumen
2009-07-16 Well Mode changed to Pumping
2010-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-26 Perforation Treatment Performed - Cement Plug
2010-01-26 Plug Back Performed
2010-01-26 Well Fluid changed to Crude Bitumen
2010-01-26 Well Mode changed to Abandoned Zone
2010-10-19 Well Abandoned
2010-10-19 Well Fluid changed to Crude Bitumen
2010-10-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-03-30 Open Hole/Barefoot Completion 604.00 614.00 0
1985-06-01 Acid Treatment 604.00 614.00 0
2001-11-23 Packing Device Capped w/Cement 590.50 598.50 0
2006-05-19 Perforation 580.50 582.50 26
2009-07-15 Packing Device Capped w/Cement 560.00 575.00 0
2009-07-15 Perforation 469.00 470.50 26
2009-07-15 Perforation 472.00 475.00 26
2010-01-26 Cement Plug 475.00 558.00 0
2010-01-26 Packing Device Capped w/Cement 415.00 465.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 540 0.0 0.0 0.0

For data sources see[5]

References