X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584051301040

Well Details

Well ID: 0584051301040
Loading map...
Location: 04/01-13-058-05W4/0
Location Alias: 04/01-13-58-05 W4M
Location Alias 2: 04/01-13-058-05 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 05
Section: 13
County/Municipality: County of St. Paul No. 19
Well Name: PENGROWTH COLD LK 1-13-58-5
Operator Name: Cona Resources Ltd.
License Number: 0117684
License Date: 1985-09-17
License Status: Abandoned
Spud Date: 1985-11-04
Final Drill Date: 1985-11-06
Well Total Depth: 606.00 m
Surface Hole Latitude: 54.010567
Surface Hole Longitude: -110.602006

For data sources see[1][2]

Well History

Date Event
1985-09-17 Obtained License
1985-10-26 Well Log Performed
1985-11-04 Direction Drilling Operation Performed - Deviate
1985-11-06 Finished Drilling
1985-11-06 Production Casing Operation Performed
1985-11-06 Rig Released
1985-11-12 Well Log Performed
1985-12-09 Perforation Treatment Performed - Jet Perforation
1986-07-25 Well Mode changed to Drilled and Cased
1987-05-22 Well Began Production
1987-05-22 Well Fluid changed to Crude Bitumen
1987-05-22 Well Type changed to Cyclical
1988-09-07 Well Fluid changed to Crude Bitumen
1988-09-07 Well Mode changed to Suspended
1988-09-07 Well Type changed to Cyclical
1990-11-01 Well Fluid changed to Crude Bitumen
1990-11-01 Well Type changed to Cyclical
1992-02-04 Well Fluid changed to Crude Bitumen
1992-02-04 Well Mode changed to Suspended
1992-02-04 Well Type changed to Cyclical
2000-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-30 Plug Back Performed
2000-10-01 Perforation Treatment Performed - Jet Perforation
2000-10-03 Well Fluid changed to Crude Bitumen
2000-10-03 Well Mode changed to Pumping
2002-06-30 Well Fluid changed to Crude Bitumen
2002-06-30 Well Mode changed to Suspended
2012-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-28 Plug Back Performed
2012-06-28 Well Fluid changed to Crude Bitumen
2012-06-28 Well Log Performed
2012-06-28 Well Mode changed to Abandoned Zone
2012-08-09 Well Abandoned
2012-08-09 Well Fluid changed to Crude Bitumen
2012-08-09 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-11-04 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-12-09 Perforation 543.50 547.50 6
1985-12-09 Perforation 564.00 572.00 6
2000-09-30 Packing Device Capped w/Cement 526.00 534.00 0
2000-10-01 Perforation 510.00 512.00 26
2012-06-28 Packing Device Capped w/Cement 391.00 503.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 2592 0.0 0.0 0.0
1988 3480 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 5207 0.0 0.0 0.0
2000 1978 0.0 0.0 0.0
2001 116 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-25 No Incident Encountered 0.00 0.00

For data sources see[7]

References