X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584090312000

Well Details

Well ID: 0584090312000
Loading map...
Location: 00/12-03-058-09W4/0
Location Alias: 00/12-03-58-09 W4M
Location Alias 2: 00/12-03-058-09 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 09
Section: 03
County/Municipality: St. Paul
Well Name: OMERS ENERGY ST.PAUL 12-3-58-9
Operator Name: AlphaBow Energy Ltd.
License Number: 0024941
License Date: 1963-10-10
License Status: Abandoned
Spud Date: 1963-10-10
Final Drill Date: 1963-10-13
Well Total Depth: 493.80 m
Surface Hole Latitude: 53.986258
Surface Hole Longitude: -111.264347

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-10-10 Obtained License
1963-10-13 Finished Drilling
1963-10-13 Well Mode changed to Drilled and Cased
1963-10-14 Production Casing Operation Performed
1963-10-16 Perforation Treatment Performed - Jet Perforation
1963-11-25 Well Began Production
1963-11-25 Well Fluid changed to Gas
1963-11-25 Well Mode changed to Flowing
1997-01-01 Well Fluid changed to Gas
1997-01-01 Well Mode changed to Suspended
1999-07-09 Perforation Treatment Performed - Jet Perforation
1999-08-25 Well Log Performed
2000-09-19 Well Fluid changed to Gas
2000-09-19 Well Mode changed to Suspended
2009-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-06-02 Plug Back Performed
2009-06-02 Well Fluid changed to Gas
2009-06-02 Well Mode changed to Abandoned Zone
2009-06-22 Well Abandoned
2015-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-10-07 Perforation Treatment Performed - Jet Perforation
2015-10-07 Plug Back Performed
2015-10-13 Perforation Treatment Performed - Jet Perforation
2015-10-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-10-14 Plug Back Performed
2015-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-10-15 Perforation Treatment Performed - Jet Perforation
2015-10-15 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-10-16 Perforation 468.80 471.20 13
2015-10-15 Perforation 60.00 61.00 17
2015-10-15 Packing Device Capped w/Cement 44.00 52.00 0
1999-07-09 Perforation 438.30 439.80 13
1999-07-09 Perforation 428.30 429.80 13
2009-06-02 Packing Device Capped w/Cement 449.00 459.00 0
2009-06-02 Packing Device Capped w/Cement 416.00 424.00 0
2015-10-07 Perforation 165.00 166.00 17
2015-10-07 Packing Device Capped w/Cement 151.00 159.00 0
2015-10-13 Perforation 105.00 106.00 17
2015-10-14 Packing Device Capped w/Cement 91.00 99.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1416 0.0 0.0 0.0
1969 5424 0.0 0.0 0.0
1970 7032 0.0 0.0 0.0
1971 6851 0.0 0.0 0.0
1972 5868 0.0 0.0 0.0
1973 4680 0.0 0.0 0.0
1974 4787 0.0 0.0 0.0
1975 8759 0.0 0.0 0.0
1976 8544 0.0 0.0 0.0
1977 657 0.0 0.0 0.0
1978 871 0.0 0.0 0.0
1979 2092 0.0 0.0 0.0
1980 8440 0.0 0.0 0.0
1981 2494 0.0 0.0 0.0
1982 6850 0.0 0.0 0.0
1983 3509 0.0 0.0 0.0
1984 4332 0.0 0.0 0.0
1985 3027 0.0 0.0 0.0
1986 5224 0.0 0.0 0.0
1987 6963 0.0 0.0 0.0
1988 4300 0.0 0.0 0.0
1989 4174 0.0 0.0 0.0
1990 4069 0.0 0.0 0.0
1991 1990 0.0 0.0 0.0
1992 8639 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8591 0.0 0.0 0.0
1995 8731 0.0 0.0 0.0
1996 4824 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-10-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References