X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584163508003

Well Details

Well ID: 0584163508003
Loading map...
Location: 00/08-35-058-16W4/3
Location Alias: 00/08-35-58-16 W4M
Location Alias 2: 00/08-35-058-16 W4/03
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 16
Section: 35
County/Municipality: Lamont County
Well Name: PALOMA ET AL BELLIS 8-35-58-16
Operator Name: 1333002 Alberta Ltd.
License Number: 0090884
License Date: 1981-06-23
License Status: RecCertified
Spud Date: 1981-06-26
Final Drill Date: 1981-06-29
Well Total Depth: 655.00 m
Surface Hole Latitude: 54.053818
Surface Hole Longitude: -112.262499

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-06-23 Obtained License
1981-06-29 Drill Stem Test Performed
1981-06-29 Finished Drilling
1981-06-29 Well Mode changed to Drilled and Cased
1981-06-30 Drill Stem Test Performed
1981-07-01 Drill Stem Test Performed
1981-07-02 Production Casing Operation Performed
1981-08-19 Perforation Treatment Performed - Jet Perforation
1982-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-08 Well Log Performed
1984-05-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-05-09 Plug Back Performed
1984-05-10 Perforation Treatment Performed - Jet Perforation
1984-11-24 Perforation Treatment Performed - Cement Squeeze
1984-11-24 Well Log Performed
1984-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-11-25 Perforation Treatment Performed - Jet Perforation
1984-11-28 Well Began Production
1984-11-28 Well Fluid changed to Gas
1984-11-28 Well Mode changed to Flowing
1990-02-01 Well Fluid changed to Gas
1990-02-01 Well Mode changed to Suspended
1990-03-24 Well Log Performed
1990-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-25 Perforation Treatment Performed - Jet Perforation
1990-03-25 Plug Back Performed
1990-03-25 Well Fluid changed to Gas
1990-03-25 Well Mode changed to Abandoned Zone
1996-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-04 Plug Back Performed
1996-07-05 Well Log Performed
1996-07-06 Perforation Treatment Performed - Jet Perforation
1996-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-07 Plug Back Performed
1996-07-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-08-19 Perforation 590.50 593.50 7
1990-03-25 Perforation 436.50 438.00 7
1996-07-04 Packing Device Capped w/Cement 542.00 550.00 0
1996-07-04 Packing Device Capped w/Cement 422.00 430.00 0
1996-07-06 Perforation 125.00 126.00 14
1996-07-07 Packing Device Capped w/Cement 117.00 117.00 0
1982-03-24 Acid Treatment 590.50 593.50 0
1984-05-09 Packing Device Capped w/Cement 579.00 587.00 0
1984-05-10 Perforation 554.00 556.00 7
1984-11-24 Cement Squeeze 554.00 556.00 0
1984-11-25 Packing Device Capped w/Cement 585.00 587.00 0
1984-11-25 Perforation 579.00 580.50 7
1984-11-25 Perforation 581.50 582.50 7
1990-03-25 Packing Device Capped w/Cement 567.00 575.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 743 0.0 0.0 0.0
1985 6330 0.0 0.0 0.0
1986 2904 0.0 0.0 0.0
1987 1416 0.0 0.0 0.0
1988 2425 0.0 0.0 0.0
1989 243 0.0 0.0 0.0

For data sources see[5]

References