X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584210513000

Well Details

Well ID: 0584210513000
Loading map...
Location: 00/13-05-058-21W4/0
Location Alias: 00/13-05-58-21 W4M
Location Alias 2: 00/13-05-058-21 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 21
Section: 05
County/Municipality: Thorhild County
Well Name: ACCEL HOLDINGS REDWATER 13-5-58-21
Operator Name: ACCEL Canada Holdings Limited
License Number: 0000544
License Date: 1949-08-26
License Status: Suspension
Spud Date: 1949-09-11
Final Drill Date: 1949-09-27
Well Total Depth: 1001.60 m
Surface Hole Latitude: 53.990682
Surface Hole Longitude: -113.096543

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-08-26 Obtained License
1949-09-20 Production Casing Operation Performed
1949-09-27 Finished Drilling
1949-09-27 Perforation Treatment Performed - Open-Hole Completion
1949-09-27 Well Mode changed to Drilled and Cased
1949-09-28 Well Began Production
1949-09-28 Well Fluid changed to Crude Oil
1949-09-28 Well Mode changed to Flowing
1950-05-27 Well Fluid changed to Crude Oil
1950-05-27 Well Mode changed to Pumping
1954-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1954-02-10 Perforation Treatment Performed - Open-Hole Completion
1983-07-01 Well Fluid changed to Crude Oil
1983-07-01 Well Mode changed to Suspended
1993-11-25 Well Log Performed
1993-11-26 Perforation Treatment Performed - Jet Perforation
1993-11-26 Well Log Performed
1993-12-14 Well Fluid changed to Crude Oil
1993-12-14 Well Mode changed to Pumping
2002-04-01 Well Fluid changed to Crude Oil
2002-04-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-09-27 Open Hole/Barefoot Completion 975.40 1001.60 0
1954-02-10 Packing Device Capped w/Cement 986.90 992.70 0
1954-02-10 Open Hole/Barefoot Completion 975.40 986.90 0
1993-11-26 Perforation 974.50 976.50 13
1993-11-26 Perforation 980.00 983.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4498 0.0 0.0 0.0
1968 6724 0.0 0.0 0.0
1969 8358 0.0 0.0 0.0
1970 8632 0.0 0.0 0.0
1971 8638 0.0 0.0 0.0
1972 2820 0.0 0.0 0.0
1973 261 0.0 0.0 0.0
1993 432 0.0 0.0 0.0
1994 7830 0.0 0.0 0.0
1995 8547 0.0 0.0 0.0
1996 8769 0.0 0.0 0.0
1997 8741 0.0 0.0 0.0
1998 8373 0.0 0.0 0.0
1999 8431 0.0 0.0 0.0
2000 6652 0.0 0.0 0.0
2001 8299 0.0 0.0 0.0
2002 709 0.0 0.0 0.0

For data sources see[5]

References