X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584222116002

Well Details

Well ID: 0584222116002
Loading map...
Location: 00/16-21-058-22W4/2
Location Alias: 00/16-21-58-22 W4M
Location Alias 2: 00/16-21-058-22 W4/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 22
Section: 21
County/Municipality: Thorhild County
Well Name: ACCEL HOLDINGS REDWATER 16-21-58-22
Operator Name: ACCEL Canada Holdings Limited
License Number: 0001663
License Date: 1950-06-26
License Status: Suspension
Spud Date: 1950-09-29
Final Drill Date: 1950-10-09
Well Total Depth: 981.80 m
Surface Hole Latitude: 54.034360
Surface Hole Longitude: -113.201971

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-06-26 Obtained License
1950-10-07 Production Casing Operation Performed
1950-10-09 Finished Drilling
1950-10-09 Perforation Treatment Performed - Open-Hole Completion
1987-05-28 Perforation Treatment Performed - Open-Hole Completion
1987-06-02 Perforation Treatment Performed - Cement Plug
1987-06-03 Perforation Treatment Performed - Cement Plug
1987-06-03 Well Log Performed
1987-06-04 Perforation Treatment Performed - Open-Hole Completion
1991-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-07-31 Perforation Treatment Performed - Jet Perforation
1991-07-31 Well Mode changed to Drilled and Cased
1992-03-12 Well Began Production
1992-03-12 Well Fluid changed to Gas
1992-03-12 Well Mode changed to Flowing
1998-05-27 Well Log Performed
2006-11-01 Well Fluid changed to Gas
2006-11-01 Well Mode changed to Suspended
2016-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-09-30 Plug Back Performed
2016-10-03 Perforation Treatment Performed - Cement Plug
2016-10-03 Plug Back Performed
2016-10-03 Well Fluid changed to Gas
2016-10-03 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-10-09 Open Hole/Barefoot Completion 975.40 978.70 0
2016-09-30 Packing Device Capped w/Cement 815.00 823.00 0
2016-10-03 Cement Plug 471.60 570.00 0
1987-05-28 Open Hole/Barefoot Completion 975.40 981.80 0
1987-06-02 Cement Plug 979.00 981.80 0
1987-06-03 Cement Plug 977.50 979.00 0
1987-06-04 Open Hole/Barefoot Completion 975.40 977.00 0
1991-07-29 Packing Device Capped w/Cement 950.40 958.00 0
1991-07-31 Perforation 828.00 831.00 13
1991-07-31 Perforation 832.50 834.00 13
1991-07-31 Perforation 835.00 837.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 3545 0.0 0.0 0.0
1993 8687 0.0 0.0 0.0
1994 7612 0.0 0.0 0.0
1995 8719 0.0 0.0 0.0
1996 8724 0.0 0.0 0.0
1997 8738 0.0 0.0 0.0
1998 8437 0.0 0.0 0.0
1999 8389 0.0 0.0 0.0
2000 8675 0.0 0.0 0.0
2001 8719 0.0 0.0 0.0
2002 8106 0.0 0.0 0.0
2003 4440 0.0 0.0 0.0
2004 8512 0.0 0.0 0.0
2005 7961 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-10-06 No Incident Encountered 0.00 0.00

For data sources see[6]

References