If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0585070112020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.984783,"lon":-114.91474,"icon":""}]} |
Location: 02/12-01-058-07W5/0 | |
Location Alias: 02/12-01-58-07 W5M | |
Location Alias 2: 02/12-01-058-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 5 | |
Range: 07 | |
Section: 01 | |
County/Municipality: Lac Ste. Anne County | |
Well Name: DAYLIGHT HELDAR 12-1-58-7 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0212582 | |
License Date: 1998-01-26 | |
License Status: RecCertified | |
Spud Date: 1998-02-20 | |
Final Drill Date: 1998-02-27 | |
Well Total Depth: 1350.00 m | |
Surface Hole Latitude: 53.984783 | |
Surface Hole Longitude: -114.914740 |
Date | Event |
---|---|
1998-01-26 | Obtained License |
1998-02-21 | Surface Casing Operation Performed |
1998-02-27 | Finished Drilling |
1998-02-27 | Well Log Performed |
1998-02-28 | Production Casing Operation Performed |
1998-02-28 | Rig Released |
1998-02-28 | Well Mode changed to Drilled and Cased |
1998-03-07 | Well Log Performed |
1998-03-08 | Perforation Treatment Performed - Jet Perforation |
1998-03-08 | Well Log Performed |
1998-03-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-01 | Well Began Production |
1999-08-01 | Well Fluid changed to Gas |
1999-08-01 | Well Mode changed to Flowing |
2002-11-01 | Well Fluid changed to Gas |
2002-11-01 | Well Mode changed to Suspended |
2003-09-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-09-28 | Plug Back Performed |
2003-09-28 | Well Fluid changed to Gas |
2003-09-28 | Well Mode changed to Abandoned Zone |
2003-09-29 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2003-09-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-09-29 | Perforation Treatment Performed - Remedial Casing |
2003-10-02 | Well Fluid changed to Gas |
2003-10-02 | Well Mode changed to Abandoned |
2003-10-03 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-03-08 | Perforation | 1305.00 | 1306.50 | 18 |
1998-03-08 | Perforation | 1308.00 | 1310.00 | 18 |
1998-03-11 | Acid Treatment | 1305.00 | 1310.00 | 0 |
2003-09-28 | Packing Device Capped w/Cement | 1284.00 | 1292.00 | 0 |
2003-09-29 | Hydra Jet Perforation | 254.50 | 255.00 | 1 |
2003-09-29 | Remedial Casing Cementing | 254.50 | 255.00 | 0 |
2003-09-29 | Packing Device Capped w/Cement | 242.00 | 250.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 1464 | 0.0 | 0.0 | 0.0 |
2000 | 1705 | 0.0 | 0.0 | 0.0 |
2001 | 7699 | 0.0 | 0.0 | 0.0 |
2002 | 5683 | 0.0 | 0.0 | 0.0 |
For data sources see[5]