X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585071707000

Well Details

Well ID: 0585071707000
Loading map...
Location: 00/07-17-058-07W5/0
Location Alias: 00/07-17-58-07 W5M
Location Alias 2: 00/07-17-058-07 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 07
Section: 17
County/Municipality: Lac Ste. Anne County
Well Name: INVERNESS HELDAR 7-17-58-7
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0066689
License Date: 1977-11-14
License Status: RecCertified
Spud Date: 1978-01-12
Final Drill Date: 1978-01-24
Well Total Depth: 1444.80 m
Surface Hole Latitude: 54.010132
Surface Hole Longitude: -115.001648

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-11-14 Obtained License
1978-01-19 Kick Occurred
1978-01-19 Lost Circulation Occurred
1978-01-24 Finished Drilling
1978-01-24 Kick Occurred
1978-01-26 Production Casing Operation Performed
1978-01-27 Well Mode changed to Drilled and Cased
1978-02-16 Perforation Treatment Performed - Jet Perforation
1978-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-02-22 Perforation Treatment Performed - Cement Squeeze
1978-02-23 Perforation Treatment Performed - Cement Squeeze
1978-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-02-28 Perforation Treatment Performed - Jet Perforation
1978-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-11-20 Well Log Performed
1987-11-02 Well Log Performed
1987-11-26 Well Log Performed
1988-12-21 Well Began Production
1988-12-21 Well Fluid changed to Gas
1988-12-21 Well Mode changed to Flowing
1990-10-01 Well Fluid changed to Gas
1990-10-01 Well Mode changed to Suspended
1993-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-06 Perforation Treatment Performed - Jet Perforation
1993-06-06 Perforation Treatment Performed - Remedial Casing
1993-06-06 Plug Back Performed
1993-06-06 Well Abandoned
1993-06-06 Well Fluid changed to Gas
1993-06-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-02-16 Perforation 1351.80 1353.30 7
1993-06-06 Remedial Casing Cementing 292.00 292.50 0
1978-02-18 Acid Treatment 1351.80 1353.30 0
1978-02-22 Cement Squeeze 1351.80 1353.30 0
1978-02-23 Cement Squeeze 1351.80 1353.30 0
1978-02-27 Packing Device Capped w/Cement 1349.70 1351.20 0
1978-02-28 Perforation 1344.80 1347.20 10
1978-03-01 Acid Treatment 1344.80 1347.20 0
1993-06-06 Packing Device Capped w/Cement 1327.00 1335.00 0
1993-06-06 Perforation 292.00 292.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 90 0.0 0.0 0.0
1988 104 0.0 0.0 0.0
1989 522 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-01-19 Kick 1354.80 1354.80
1978-01-19 Lost Circulation 1354.80 1443.80
1978-01-24 Kick 1354.80 1443.80

For data sources see[6]

References